Similar Projects
D/B - Traffic Signal Mast Arm Hardening Design Build Project
Infrastructure
Bidding
$200,000 est. value
Panama City, FL

West Cleveland Street at Rome Avenue Traffic Signal - FDOT LAP
Infrastructure
Bidding
$435,396 est. value
Tampa, FL 33606

Remote Activated Pedestrian Signal System
Post-Bid
FL

Emergency Response Traffic Signals Restoration
Infrastructure
Post-Bid
$3,000,000 est. value
FL

Babcock/Apollo Mast Arms and PED Improvements
Results
Melbourne, FL 32901

Traffic Signals
Results
Less than $1,700,843 est. value
Melbourne, FL 32940

Push-Button Contract for Traffic Signal Improvements - South
Infrastructure
Post-Bid
$3,068,323 est. value
Miami, FL 33134

County Line Road at US 92 New Tampa Highway Intersection Improvement
Results
Lakeland, FL

Push-Button Contract for Traffic Signal Improvements - North
Infrastructure
Post-Bid
$3,451,854 est. value
Doral, Ives Estates, Miami, Miami Lakes, FL 33134

Installation of Emergency Traffic Signal
Results
Ocean City, FL

Warning Light, Solar Powered, Purchase/Delivery, Term Contract
Term Contract
Post-Bid
FL

BRT East Transportation Signal Priority (TSP) Installation
Results
$2,142,727 est. value
Jacksonville, FL

Adaptive Traffic Signal Control for Multiple Locations
Infrastructure
Post-Bid
$2,639,000 est. value
Boca Raton, FL

Maintenance of Traffic
Results
$100,000 est. value

Traffic Signal Preventive Maintenance - North Zone
Infrastructure
Post-Bid
$1,094,000 est. value
FL

Last Updated 06/21/2022 11:31 PM
Project Title

Low Bid Design Build For Signal and Ped Facility Installations on US 41 at I-275

Physical Address View project details and contacts
City, State (County) FL   (Manatee County)
Category(s) Heavy and Highway
Sub-Category(s) Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of Mast Arm signals at the I-275 ramp terminals with US 41. Project includes a new mast arm signal at the I-275 EB off ramp terminal with US 41 and replacement of an existing span wire signal configuration at the I-275 WB ramp terminal with US 41 with a mast arm. The improvements include signalized pedestrian crossings as well as milling and resurfacing to harmonize the pavement markings and associated sidewalks.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents