Similar Projects
RFQ - Various Phase I/II and/or III Materials Quality Assurance Testing and Inspection Projects, Various Routes
Term Contract
Conception
$500,000 CJ est. value
Collinsville, IL 62234

Home2Suites and Hilton Garden Inn / Edwardsville
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Edwardsville, IL 62025

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Design
$4,000,000 CJ est. value
Dixon, IL 61021

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Design
$4,000,000 CJ est. value
Dixon, IL 61021

Construction of a Equipment Utility Building
New Construction, Infrastructure - 5,700 SF
Bidding
$900,000 CJ est. value
Kampsville, IL 62053

Public Safety Building at Emerson Park Metro Station
New Construction, Infrastructure - 16,113 SF
Bidding
$15,000,000 CJ est. value
East Saint Louis, IL 62201

Power Poles for cameras
Infrastructure
Sub-Bidding
$10,000 CJ est. value
Salem, IL 62881

Demolition of Residential Structures Program 2022
Demolition, Infrastructure
Sub-Bidding
$30,000 CJ est. value
Jerseyville, IL 62052

Weatherization 100 Year Floodplain Project
New Construction
Post-Bid
Granite City, Madison, IL 62040

Traffic Signal and Street Light Maintenance
Post-Bid
Granite City, IL

Riverfront Development Phase 8
Results
$2,727,884 est. value
Alton, IL 62002

Salt Storage, Generator and Sewer Connection Phase 2 (Plumbing & Electrical)
New Construction
Results
Less than $400,000 est. value
Carrollton, Hamel, Jerseyville, IL

2021 Water Main Extensions - Contract A
Alteration
Construction
Sandoval, IL 62882

2022 High School Partial Pavement Replacement
Infrastructure
Construction
$31,450 CJ est. value
Trenton, IL 62293

2022 Bond - Highland Primary School and Middle School Addition - Highland CUSD #5
Addition, Demolition, New Construction, Infrastructure
Pending Verification
$40,000,000 CJ est. value
Highland, IL 62249

Last Updated 08/08/2022 03:03 PM
Project Title

Maintain and Service All ITS Equipment at Various Locations and Replacement of the Dynamic Message Board on Westbound I-70

Physical Address View project details and contacts
City, State (County) Holiday Shores, IL 62025   (Madison County)
Category(s) Heavy and Highway, Outdoor Lighting, Single Trades
Sub-Category(s) Electric, Maintenance, Roadway Lighting, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $457,609 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Maintain and service all ITS equipment at various locations throughout District 8 and replacement of the dynamic message board on westbound I-70 at mile marker 16.8. Region 5 District 8 Federal Project # N/A County(s) Various Key Route(s) Various Marked Route(s) Section(s) DIST 8 ITS 2023-1 State Job #(s) C-98-068-22 PPS #(s) 0-01113-8001 Questions not accepted as of July 26, 2022 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashiers check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared not responsive, it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, June 24, 2022. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 033 - Maintain and Service All ITS Equipment at Various Locations and Replacement of the Dynamic Message Board on Westbound I-70

Details

Division 01 - General Requirements, Cleaning and Waste Management.
Division 10 - Specialties, Signage.
Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents