Similar Projects
RidgeGate - Master Planning
New Construction - 1,200,000 SF
Conception
$10,000,000 CJ est. value
Lone Tree, CO 80124

Sanders Business Park at Castle Rock
New Construction
Conception
Castle Rock, CO 80104

O'Reilly Auto Parts (PK2)
New Construction - 6,800 SF
Design
$500,000 to $900,000 est. value
Parker, CO 80108

Sephora
Renovation - 2,500 SF
Design
Lone Tree, CO 80124

Aerie #2565
Build-Out - 4,300 SF
Post-Bid
Castle Rock, CO 80104

Target #2716 Grocery Pick Up
Renovation
Post-Bid
Highlands Ranch, CO 80129

7-Eleven
New Construction - 7,200 SF
Construction
$1,000,000 est. value
Castle Rock, CO 80104

Abercrombie Kids #21537
Build-Out - 3,054 SF
Construction
$250,000 est. value
Lone Tree, CO

Pizza Hut
New Construction, Demolition - 6,283 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Castle Rock, CO 80104

Regency Residential Market Rate Apartments - Phase II
New Construction
Design
Lone Tree, CO 80134

Walmart 0-3--TENANTBID--2021 - Bundle #3
Renovation
Post-Bid

Regency Residential Market Rate Apartments - Phase I
New Construction - 10,000 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Lone Tree, CO 80124

Ulta Beauty at Target #2219
Renovation - 1,000 SF
Design
Parker, CO 80134

Ulta Beauty at Target #2023
Renovation - 1,000 SF
Design
Lone Tree, CO 80124

Ulta Beauty at Target #2716
Renovation - 1,000 SF
Design
Highlands Ranch, CO 80129

Last Updated 07/30/2021 02:57 PM
Project Title

The Learning Experience and Parker Retail Building

Physical Address View project details and contacts
City, State (County) Parker, CO 80134   (Douglas County)
Category(s) Commercial, Education
Sub-Category(s) Pre-School/Daycare, Retail
Contracting Method General Contractor to Subcontract.
Project Status Permitting
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mixed Use. This project is for 2 buildings on adjacent lots to be built concurrently. The Learning Experience is a pre-school. The second building is a single story retail building. Please provide separate bids for each building.

Details

1 Retail, 1 Story Above Grade, 4,713 SF New Construction, 1 Pre-School/Daycare, 1 Story Above Grade, 10,000 SF New Construction.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Specialty Doors and Frames, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Flagpoles.
Division 11 - Equipment, Loading Dock Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Institutional Furniture, Classroom Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Clearing and Grubbing, Selective Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents