Similar Projects
Last Updated | 12/29/2020 01:44 AM |
Project Title | Rubber Dam Bladder (Bag) 6 |
Physical Address | View project details and contacts |
City, State (County) | PA (Northumberland County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dam/Tunnel |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | To procure a replacement Rubber Dam Bladder (Bag) for the existing dam bladder to be replaced, Bag #6. Bag #6 was installed previously in 1985 and 2012, and was manufactured respectively by Bridgestone Tire and Rubber Company and Mecan-Hydro. The Bridgestone bag was approximately 13.4- millimeter thickness. The new bag shall be compatible in design and operation to the Bridgestone bags. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |