Similar Projects
Water Main Replacement
Design
Elmwood Park, IL

Water Main at Mile Long Bridge
Infrastructure
Bidding
IL

I-21-4597 Water Main Construction at Mile Long Bridge
Infrastructure
Bidding
IL

Water Distribution System Leak Survey
Post-Bid
Oak Park, IL

Water Supply Leak Detection Survey
Post-Bid
Park Ridge, IL 60068

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Watermain Replacement
Results
Park Ridge, IL 60068

2021 Water Main Improvements
Infrastructure
Bidding
Park Forest, IL

Basement Water Main Pipe
Renovation
Post-Bid
Park Forest, IL 60466

Watermain Valve Insertion
Results
Park Ridge, IL 60068

LaGrange Road Sewer, Water Main Extension and Lift Station Post 20
New Construction, Infrastructure
Bidding
Tinley Park, IL 60477

On-Call Emergency And Routine Water System Repair Services
Post-Bid
Broadview, Westchester, IL 60155

Well 2 Raw Water Main CIPP Lining
Results
$125,000 est. value
Park Forest, IL 60466

Large Meter Testing
Term Contract
Post-Bid
Wheeling, IL 60090

Comprehensive Water Distribution System Leak Survey
Results
Homewood, IL 60430

Last Updated 11/30/2021 09:45 AM
Project Title

2020 Water Main Improvements

Physical Address View project details and contacts
City, State (County) Chicago, IL   (Cook County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,149,969
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents