Similar Projects
Blackburn Street Multi-Residential Renovation
Addition, Demolition, Infrastructure
Design
$600,000 CJ est. value
Gurnee, IL 60031

Blackburn Street Multi-Residential Renovation
Addition, Demolition, Infrastructure
Design
$600,000 CJ est. value
Gurnee, IL 60031

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

2021 Road Repairs
Term Contract
Post-Bid
Antioch, IL

2020 Alley and Parking Lot Improvements
Infrastructure
Results
Waukegan, IL 60085

Sealcoating and Striping at Various Locations
Results
Lake Zurich, IL

Peterson Road Mixed Use
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Libertyville, IL 60048

Seymour Alley Reconstruction
Infrastructure
Post-Bid
Mundelein, IL

2021 Road Program
Results
Lake Zurich, IL

Community Park Paving Improvements
Alteration
Post-Bid
Mundelein, IL 60060

Asphalt Pavement and Concrete Sidewalk Repairs
Results
Libertyville, IL 60048

Cleaning and Painting of Steel Bridge Structures at 3 Locations
Infrastructure
Post-Bid
Deerfield, Des Plaines, Highland Park, Northbrook, IL 60062

Pulverization of The Existing Pavement and the Construction of Hot-Mix Asphalt Binder and Surface Courses
Results
Less than $137,064 est. value
Libertyville, IL

Soil Preparation at Grant Woods Forest Preserve
Infrastructure
Post-Bid
Ingleside, IL 60041

FYE 2021 Streets Program - Bid Package #1
Results
$989,697 est. value
Round Lake Beach, IL

Last Updated 11/16/2022 10:20 AM
Project Title

2022 Street Improvement Project

Physical Address View project details and contacts
City, State (County) Wauconda, IL 60084   (Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected February 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

All driveway repairs, landscape restoration and utility adjustments have been completed. Peter Baker & Son is planning to perform paving starting Monday, November 14 through Tuesday, November 15. No parking signs will be posted on Saturday to notify motorists of the pending schedule. Pavement striping will be scheduled accordingly based on the asphalt completion. Leveling binder (first) layer asphalt installation is scheduled for Thursday (10/20) and Friday (10/21). Finishing of concrete sidewalk/curb and temporary measures to ensure a safe and fun Trick or Treat Main Street are scheduled for the week of 10/24. Milling is to commence Saturday, October 15 at 7:00 AM and will be completed by mid morning. Base preparation will be conducted early in the week with binder (first) layer asphalt installation scheduled for mid-week. Miscellaneous concrete repairs scheduled for the week of October 24th along with temporary measures to ensure a safe and fun Trick or Treat on Main Street. The attached project flyer provides a general overview of the anticipated schedule. Material availability has challenged the contractor's ability to schedule some work at the speed they would prefer. Please know that the Village and Peter Baker & Son Co. are working closely to ensure the project is completed as quickly as possible with the limitations presented. The Village's street improvement program is underway. Two components of the project currently in progress are: Concrete removal and repairs throughout the project area. The contractor is starting curb replacement on Slocum Lake Rd and Brown St. The work on Slocum Lake Rd will require traffic entering and exiting the Country Ridge subdivision to be detoured to Brown St for five to seven days. The entrance will reopen during the week of September 12. Asphalt grinding on Nancy Ct, Barbara Lane, Garland Rd, Van Buren Ave, Monroe Ave, Edgewater Parkway, Washington Ave, Jackson Ave. The existing asphalt will be removed to prepare for new layers. If you have any questions, please contact Scott Reisinger at HMG Engineers, Inc. (cell phone: 847-668-3141 or office phone: 847-362-5959) or Public Works at (847) 526-9610. Street Name Project Area Wilson Ave Main St - Ridge St Lake View Ave West End - Hammond St Ridge St Kimball Ave - Route 176 Ridge Ct Ridge St Lotus St High St - Kimball Ave Oaks Ave Barrington Rd - Main St High Ct All High St and Cul-de-Sac Lotus St - Alvina St Garland Rd Bonner Rd - South of Northshore Dr Nancy Ct All Barbara Ln Bonner Rd - Sheridan Dr Van Buren Ave Bonner Rd - Sheridan Dr Monroe Ave Bonner Rd - Sheridan Dr Alley (Edgewater Pkwy) Madison Ave - Jackson Ave Edgewater Pkwy Monroe Ave - Jackson Ave Washington Ave Bonner Rd - Northshore Dr Jackson Ave Bonner Rd - Sheridan Dr Jackson Ave North Shore Dr - Edgewater Pkwy Slocum Lake Rd Route 12 - Brown St Brown St Route 176 - Slocum Lake Rd Main St Garland Rd - Route 176 Sunset Ridge Intersection Intersection Woodland Rd North of Sunnyside Ave & South of Highland Ave The method of Contractor Selection has not been Determined at this time

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents