Last Updated | 11/16/2022 10:20 AM |
Project Title | 2022 Street Improvement Project |
Physical Address | View project details and contacts |
City, State (County) | Wauconda, IL 60084 (Lake County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected February 2023 , Construction documents |
Bids Due | View project details and contacts |
Estimated Value | $200,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | All driveway repairs, landscape restoration and utility adjustments have been completed. Peter Baker & Son is planning to perform paving starting Monday, November 14 through Tuesday, November 15. No parking signs will be posted on Saturday to notify motorists of the pending schedule. Pavement striping will be scheduled accordingly based on the asphalt completion. Leveling binder (first) layer asphalt installation is scheduled for Thursday (10/20) and Friday (10/21). Finishing of concrete sidewalk/curb and temporary measures to ensure a safe and fun Trick or Treat Main Street are scheduled for the week of 10/24. Milling is to commence Saturday, October 15 at 7:00 AM and will be completed by mid morning. Base preparation will be conducted early in the week with binder (first) layer asphalt installation scheduled for mid-week. Miscellaneous concrete repairs scheduled for the week of October 24th along with temporary measures to ensure a safe and fun Trick or Treat on Main Street. The attached project flyer provides a general overview of the anticipated schedule. Material availability has challenged the contractor's ability to schedule some work at the speed they would prefer. Please know that the Village and Peter Baker & Son Co. are working closely to ensure the project is completed as quickly as possible with the limitations presented. The Village's street improvement program is underway. Two components of the project currently in progress are: Concrete removal and repairs throughout the project area. The contractor is starting curb replacement on Slocum Lake Rd and Brown St. The work on Slocum Lake Rd will require traffic entering and exiting the Country Ridge subdivision to be detoured to Brown St for five to seven days. The entrance will reopen during the week of September 12. Asphalt grinding on Nancy Ct, Barbara Lane, Garland Rd, Van Buren Ave, Monroe Ave, Edgewater Parkway, Washington Ave, Jackson Ave. The existing asphalt will be removed to prepare for new layers. If you have any questions, please contact Scott Reisinger at HMG Engineers, Inc. (cell phone: 847-668-3141 or office phone: 847-362-5959) or Public Works at (847) 526-9610. Street Name Project Area Wilson Ave Main St - Ridge St Lake View Ave West End - Hammond St Ridge St Kimball Ave - Route 176 Ridge Ct Ridge St Lotus St High St - Kimball Ave Oaks Ave Barrington Rd - Main St High Ct All High St and Cul-de-Sac Lotus St - Alvina St Garland Rd Bonner Rd - South of Northshore Dr Nancy Ct All Barbara Ln Bonner Rd - Sheridan Dr Van Buren Ave Bonner Rd - Sheridan Dr Monroe Ave Bonner Rd - Sheridan Dr Alley (Edgewater Pkwy) Madison Ave - Jackson Ave Edgewater Pkwy Monroe Ave - Jackson Ave Washington Ave Bonner Rd - Northshore Dr Jackson Ave Bonner Rd - Sheridan Dr Jackson Ave North Shore Dr - Edgewater Pkwy Slocum Lake Rd Route 12 - Brown St Brown St Route 176 - Slocum Lake Rd Main St Garland Rd - Route 176 Sunset Ridge Intersection Intersection Woodland Rd North of Sunnyside Ave & South of Highland Ave The method of Contractor Selection has not been Determined at this time |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |