Similar Projects
Cypress Bridge Wellfield Improvements Project
Infrastructure
Bidding
Tampa, FL

Multi-Year Contract for Repair of Electrical Motors and Pumps
Term Contract
Bidding
Atlantic Beach, FL

Transfer Pump Replacement
Post-Bid
Less than $1,735,000 est. value
Hallandale, FL 33009

Solid Waste Flygt Pump
Post-Bid
FL

Replace Chiller and Pumps at USCG Sector Key West, Florida
Results
$250,000 to $500,000 est. value
Big Coppitt Key, FL 33040

New Well 16 Construction and Well 11 Abandonment
Results
Jacksonville Beach, FL 32227

As-Needed Well Drilling Construction, Rehabilitation and Repair Services
Term Contract, Infrastructure
Bidding
FL

Unit 5 52 Circulating Water Pump Overhaul at Mcintosh Power Plant
Post-Bid
Lakeland, FL 33805

Oak Meadows Water Supply Facility Well Houses
Results
Less than $2,000,000 est. value
Orlando, FL 32835

West Water Reclamation Facility Temporary Storage Tank and Emergency Pump
Infrastructure
Bidding
Winter Springs, FL

Wells and Pressure Tank Purchase and Installation Services
Post-Bid
Fort Pierce, FL 34945

Wells and HSP Pump Services
Term Contract
Results
Orlando, FL 32801

Irrigation Pump System
Infrastructure
Bidding
Fort Lauderdale, FL 33325

Annual Agreement For Wastewater Pump Station Repair And Renovation
Term Contract
Post-Bid
FL

Repair Services for Pumps, Motors, and Other Equipment
Results
Kissimmee, FL 34741

Last Updated 09/16/2021 11:50 PM
Project Title

PW 1814 South Plant Well 1 Modification

Physical Address View project details and contacts
City, State (County) Winter Park, FL 32792   (Seminole County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $481,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is to improve the water quality of the City’s South Water Treatment Plant (WTP) Well S-1 located at 1890 Casselton Drive, Casselberry, Florida 32707 by deepening the well to match the depth of the WTP’s two (2) other production wells. The Work consists of furnishing all labor, equipment, and materials for the construction of the facilities.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents