Similar Projects
Science Lab Renovation for Geneva County High School
Renovation
Bidding
Hartford, AL 36344

Bob Jones High School Special Education Addition
Addition
Bidding
Madison, AL 35758

Cullman High School Gym Renovation
Renovation
Post-Bid
Cullman, AL 35055

A New Classroom Building for the Helen Keller School Campus
New Construction
Post-Bid
Talladega, AL 35160

New Weight Room Building for Chelsea High School
New Construction
Results
Chelsea, AL 35043

New Hueytown Intermediate School
New Construction - 92,000 SF
Results
Less than $16,879,000 est. value
Hueytown, AL

Classroom and Fine Arts Addition for Hewitt-Trussville Middle School
Addition - 24,000 SF
Construction
Trussville, AL

Fairhope K-6 School Addition
Addition
Construction
Robertsdale, AL

Portable Classrooms at Legacy Prep School
New Construction
Bidding
Birmingham, AL

Visitor Bleacher Replacement At Brewer Hs Football Stadium
Post-Bid
Somerville, AL

Additions and Renovations to Sparkman Middle School
Renovation, Addition
Results
Less than $2,213,000 est. value
Toney, AL

Oakwood Adventist Academy - New High School Building
New Construction - 19,742 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Huntsville, AL 35896

BOE Office Elevator Replacement
Post-Bid
Auburn, AL 36830

Renovations to Hueytown Middle School
Renovation
Results
Less than $11,000,000 est. value
Hueytown, AL 35023

Renovations and Additions to Homewood High School - Phase 2
Renovation, Addition
Construction
Homewood, AL

Reported 05/25/2021 02:38 PM
Project Title

Orange Beach High School Field House

Physical Address View project details and contacts
City, State (County) Orange Beach, AL 36561   (Baldwin County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of an addition to an existing building of approximately 3,777 square feet for a new workout area with related locker facilities. The existing building of approximately 4,080 square feet requires no work except the large room that will connect to the new addition to create a large workout room. The addition will be load bearing concrete masonry walls with wood trusses and concrete slab. Sitework will be limited to striping for new parking spaces on the existing paved areas.

Details

1 Middle/Senior High School, 3,777 SF Addition.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents