Similar Projects
Window Replacement and Facade Repairs at Beatley Library
Bidding
Alexandria, VA 22304

Roof, Window, Door and Lighting Replacements Project Animal Husbandry Barn Building 0550
Bidding
Blacksburg, VA 24060

Caulking for Windows at the Meyera E. Oberndorf Central Library
Post-Bid
Virginia Beach, VA

City Hall Painting and Window Repair Project
Post-Bid
Alexandria, VA

CP Door Removal and Installation
Results
Norfolk, VA

Transit Maintenance Overhead Steel Roll Up Doors
Results
$46,000 est. value
Blacksburg, VA 24060

Administration Building Window and Cornice Repainting
Bidding
Chesterfield, Richmond, VA 23235

GWMP: ARHO INT Storm Window Inserts
Post-Bid
Arlington, Fort Myer, VA 22211

Removal and Replacement of Sliding Glass Doors
Results
Chesapeake, VA 23322

Five Below
Renovation - 8,118 SF
Post-Bid
Winchester, VA 22601

Detention Doors, Frames, and Hardware
Results
State Farm, VA 23160

Doors Flush Lauan Unfinished Hollow Core Veneer Slab
Post-Bid
Norfolk, VA 23510

Glass/Glazing Services
Term Contract
Results
Radford, VA 24142

Window Film for Senior Center and Two Voter Registrar Locations
Post-Bid
Yorktown, VA 23690

Multi-Story Commercial Building Window Glass Replacements
Term Contract
Results
Norfolk, VA 23504

Last Updated 05/04/2020 02:21 PM
Project Title

Overhead, Roll Up, Folding and Bay Door Testing, Inspection and Repair

Physical Address View project details and contacts
City, State (County) Arlington, VA 22204   (Arlington County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Ensure no open holes or breaks are in the surface or frame. 2. Ensure slats, endlocks, bottom bar, guide assembly, curtain, entry, hood and flame baffle are installed correctly and intact. 3. Ensure curtain guides are aligned, level and plumbed for smooth operation. 4. Ensure drop release arms are unobstructed. 5.Ensure smoke detectors connected to the fire door are in good working condition and inspected per code. 6.Ensure release hardware is in good working condition, and fusible links are in the correct position and free of any coatings. 7. Door must have an average speed between six (6) inches and twenty-four (24) inches per second.

Details

Division 08 - Openings, Doors and Frames, Windows.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents