Similar Projects
16" Water Main - Signal Butte Road, Pecos Road to Germann
Bidding
$1,400,000 to $1,600,000 est. value
Mesa, AZ 85213

Festival Ranch Planning Area 2 Kerry Lane Infrastructure Water Line and Offsite Water Line
Bidding
Buckeye, AZ

Kyrene Middle School Underground Piping Replacement
Term Contract
Post-Bid
$3,200,000 est. value
Tempe, AZ 85284

Storm Drain Catch Basins
Term Contract
Post-Bid
AZ

The Grid Mixed Use Project Site Improvements CMAR
Renovation
Results
$2,500,000 to $4,500,000 est. value
Mesa, AZ 85201

Construction of a Water and Sewer Line
Results
Less than $332,464 est. value
Tolleson, AZ 85353

Pecos Parcel - Water and Sewer
Construction
$51,000 est. value
Chandler, AZ 85226

128th Street Box Culvert Construction Project
Construction
Scottsdale, AZ 85255

Professional Services for Water Main Replacements
Bidding
$5,000,000 est. value
Chandler, AZ

Professional Services for Loop 101 and Loop 202 Freeway Waterline and Sewer Rehabilitation
Post-Bid
Chandler, AZ 85225

Water Meters
Results
Glendale, AZ 85301

Professional Services for Water Main Replacements 2019 - Westwood Manor, Kingston and Chieftain Village
Bidding
Chandler, AZ

Professional Services For Loop 101 And 202 Freeway Waterline And Sewer Rehabilitation City
Post-Bid
Chandler, AZ

Job Order Contracting Services For Sewer Main And Manholes
Results
Chandler, AZ

Water Main Replacements
Bidding
$1,000,000 to $5,500,000 est. value
Chandler, AZ

Last Updated 04/06/2020 08:18 PM
Project Title

Landfill Gas, Groundwater and Storm Water Systems Installation, Maintenance, Parts and Service

Physical Address View project details and contacts
City, State (County) Glendale, AZ 85301   (Maricopa County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall furnish all labor, materials, supplies and equipment necessary to fabricate, install and deliver products to the City Landfill for maintaining its methane gas and water management systems. Contractor must be able to perform maintenance and service on, but not limited to, the following products: a. SDR 11 HDPE. b. HDPE and PVC-18”, 12”, 6”, 4” and 2” pipe.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents