Similar Projects
Contract 3 BEL - TR235 Slide Repairs
Infrastructure
Bidding
Jacobsburg, OH

Bright Road II Slope Repair
Infrastructure
Bidding
Fairpoint, OH

Jug Run Road Repair and Culvert Replacement
Post-Bid
Colerain, OH 45251

Slip Repair on Mills Hill
Post-Bid
Shadyside, OH

BEL-CR102-17.77 (PW#273) Slide Repair
Results
Saint Clairsville, OH 43950

Slide Repair - SR 148 17.730
Results
OH

Coleman Road Slope Repair
Infrastructure
Bidding
Fairpoint, OH

TR 133 Cove Road
Post-Bid
OH

Precast Catch Basins, Risers, and Grates
Term Contract
Results

Bright Road I Slope Repair
Infrastructure
Bidding
Fairpoint, OH

Jacking and Boring Services
Post-Bid

Slide Repair - SR 26-00.35 And Var
Results
OH

FEMA Disaster Event DR-4360
Infrastructure
Bidding
Bellaire, OH 43906

BEL-TR103 Slide Repairs - Contract 2
Post-Bid
OH

Slide Repair - SR 9 9.200
Results
OH

Last Updated 06/16/2021 01:49 PM
Project Title

Kennon Street Mine Drain

Physical Address View project details and contacts
City, State (County) Bridgeport, OH 43912   (Belmont County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $81,274
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Problem consists of drainage from an abandoned underground mine adversely affecting homes and a public road. The intent of this project is to collect the mine drainage and divert the water away from the affected home and public roadway. The project includes the construction a rock lined channel and drain system to collect and convey mine drainage to an adjacent storm water channel. The project includes the restoration of the site and public roadway. Major work items include: 1. Mobilization 2. Maintaining traffic 3. Installation of sediment controls 4. Clearing and grubbing 5. Construction of rock lined channel 6. Construction of 12" storm sewer starting at the outlet and working upstream 7. Construction of 8" storm sewer 8. Debris removal and disposal (rear CMU wall/spring house) 9. Excavate bench for aggregate drain installation 10. Construction of aggregate drain 11. Final grading 12. Application of standard revegatation to the disturbed areas 13. Pavement replacement.

Details

Division 01 - General Requirements, Examination and Preparation, Mobilization.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Finish Grading, Erosion and Sedimentation Controls, Rock Stabilization.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents