Similar Projects
Last Updated | 03/08/2023 03:53 PM |
Project Title | RFP D/B - Solar Implementation at Chollas Buildings A and B and Solar Implementation at ETDC |
Physical Address | View project details and contacts |
City, State (County) | San Diego, CA 92101 (San Diego County) |
Category(s) | Government/Public, Residential |
Sub-Category(s) | Apartments/Condominiums, Misc. Buildings |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected July 2023 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $2,425,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Bid Valid 120 Calendar Days Liquidated Damages $1,000 Per Day License Requirements B or C-10 or C-46 Project Duration 264 Working Days 2.1 The Design-Builder shall perform commissioning of the renewable energy systems and meters/submeters for both the ETDC and Chollas sites. 2.2 The Design-Builder shall provide and install a complete solar photovoltaic system for Chollas Buildings A & B. The solar photovoltaic system will provide energy to the two Chollas Buildings. The Design-Builder shall provide all design, permits, materials for construction/installation, utility coordination, and testing and commissioning of approximately 236 kW of solar power systems total (Approximately 105 kW for Building A and 131 kW for Building B), or system that produces maximum output possible based on the available space. The system will include rooftop mounted solar systems. 2.3 The Design-Builder shall provide and install a complete solar photovoltaic system for the Employment Training Development Center (ETDC) parking lot and interconnect to ETDC building. The solar photovoltaic system will provide energy to the ETDC building. The Design-Builder shall provide all design, permits, materials for construction/installation, utility coordination, and testing and commissioning of approximately 190 kW of solar power systems total, or system that produces maximum output possible based on the available space. The system will include rack/canopy mounted systems (parking lot). 2.4 The Design-Builder shall design and construct each site to obtain the highest kilowatthour (kWh) output at the lowest cost and be installed as necessary to accommodate the individual aesthetics and requirements based on building characteristics, location, and ease of access. All solar power generating equipment, inverters, and metering must meet the manufacturer's equipment installation and warranty requirements. 2.5 The Design-Builder shall assist the City in the preparation and submittal of Net Energy Metering (NEM) Interconnection Application and Agreement for the solar photovoltaic systems, in accordance with Rule 21 from local electric utility service company. All equipment required for SDG&E interconnection including meters should be the Design-Builder's responsibility. 2.6 The Design-Builder shall evaluate and provide recommendation on the final system size based on available data and facility need. 2.7 The Design-Builder shall incorporate the accessibility requirements in the design where applicable. For the Preliminary Accessibility Evaluation report, please refer to Attachment CC. It is the Design-Builder's responsibility to ensure that the project design complies with current accessibility codes and regulations. 2.8 The Design-Builder shall incorporate environmental requirements in both the design and construction where applicable. For the Preliminary Environmental Assessment report, please refer to Attachment DD for Chollas Buildings A and B and Attachment EE for ETDC Building. All those wishing to submit a Proposal are encouraged to visit the Work Site with the Engineer. The purpose of the Site visit is to acquaint the Proposers with the Site conditions. To request a sign language or oral interpreter for this visit, call the Public Works Division at (619) 533-3450 at least 5 Working Days prior to the meeting to ensure availability. Response Format Electronic Project Type RFP (Request for Proposal) Type of Award Lump Sum Online Q&A No All questions related to this solicitation shall be submitted to: JEEspindola@sandiego.gov Questions received less than 14 Days prior to the Proposal due date may not be considered. |
||||||||||||||||||||||||||||||||||||||
Details | 12,670 SF.
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |