Similar Projects
RFQ Engineering - Railroad Quiet Zones
Infrastructure
Bidding
$500,000 CJ est. value
Eureka, MO 63025

North County Workforce and Business District, University of Missouri St. Louis South Campus Development
New Construction, Infrastructure
Post-Bid
$2,000,000 est. value
Beverly Hills, MO 63121

MetroLink Stations Secure Platform - Design Services
Infrastructure
Post-Bid
$1,638,000 est. value
Saint Louis, MO

Engineering - Mort Jacobs Park BMP Design
Infrastructure
Results
Overland, MO 63114

Engineering - North Sappington Road Preservation
Infrastructure
Post-Bid
$1,105,500 est. value
Glendale, MO 63122

Design - New Normandy High School Gym
New Construction, Infrastructure
Post-Bid
$4,000,000 to $5,750,000 est. value
Hanley Hills, MO 63133

Engineering - Rehabilitate Bridge Over Missouri River
Alteration
Post-Bid
$5,220,000 est. value
Crystal Lake Park, MO 63131

RFQ - Comprehensive Plan Update
Term Contract
Post-Bid
Olivette, MO 63132

Engineering - Spoede Road Bridge Replacement
Infrastructure
Post-Bid
$16,000 est. value
Frontenac, MO 63131

RFQ Engineering - Canton Ave Resurfacing, Sidewalks and Curb and Gutter Improvements
Infrastructure
Post-Bid
$663,433 est. value
Saint Louis, MO 63114

Engineering - Bridge
Demolition, New Construction, Infrastructure
Post-Bid
$114,270,160 CJ est. value
Saint Louis, MO 63131

Reconstruction of Taxilane Charlie from Taxiway Sierra to Taxiway Golf at St. Louis Lambert International Airport
Infrastructure
Post-Bid
$3,014,391 CJ est. value
Saint Louis, MO 63145

Geotechnical Services : Bid Package 0
Infrastructure
Post-Bid
Saint Louis, MO

Design - Professional Design Services for Police Station Building Upgrades
Infrastructure
Post-Bid
$300,000 est. value
Kirkwood, MO 63122

RFQ Engineering - Replace Existing Bridge X0489 , Replace Existing Structures A8533 and A8534 With Box Culverts and Rehab Existing Bridge A3871
Demolition, New Construction, Infrastructure
Post-Bid
$3,780,000 CJ est. value
Neier, MO 63084

Last Updated 10/12/2023 10:34 AM
Project Title

Traffic Control, Bridge Rehabilitation

Physical Address View project details and contacts
City, State (County) Saint Louis, MO 63131   (Saint Louis County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids
Project Status Design Development, Request for Qualifications, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $11,500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 3, 2023 a design team has been selected. Job No: J6I3534 & J6S3556 Location: J613534 - I-270/I-55 Interchange; I-270/I-44 Interchange; I-44 over the Meramec River. Project Involves Br. A-4811, A- 4882, A-5411, A-5412, A8231 and A-8683. J6S3556 - Marris road Over I-55, Geyer RoadOver I-44, Cragwold over I-270, I-270 over I-44 and bridge painting on the ramp from I-270 west to Route 67. Proposed Improvement: The Proposed Improvement of traffic control; bridge rehabilitation; bridge deck, and substructure repairs; expansion joint and bearing replacements; deck sealing; epoxy polymer overlays, steel girder blasting and recoating with System G; overcoating System G, and other misc. items of work Length: J613534 - 1.06 miles. J6S3556 - 0.36 miles. Approximate Construction Cost: $11.5 million DBE Goal (if applicable) 0% The method of contractor selection has not been determined at this time. MODOT - RFQ Engineering - Traffic Control, Bridge Rehabilitation

Details

Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents