Similar Projects
Doolittle Elementary School Boiler Replacement
Bidding
Cheshire, CT 06410

J--Boiler Services VA Medical Centers New England
Post-Bid
Hartford, Newington, West Haven, CT - Bedford, Jamaica Plain, Leeds, MA - Manchester, NH - Providence, RI 06111

J043--PM for Boiler Air Compressor
Post-Bid
West Haven, CT

REPLACE BOILERS - Paul J. Sutcovoy USARC - Lydia Street EXT, Waterbury, CT 06705
Results
$25,000 to $100,000 est. value
Waterbury, CT 06705

Replacement of 2 Boilers at John G. Prendergast School
Results
$200,000 to $300,000 est. value
Ansonia, CT 06401

Walsh Boilers Replacement
Post-Bid
Waterbury, CT 06704

Cafeteria Renovations Highland School (Replace Government Freezer)
Results
Cheshire, CT 06410

J048--Sources Sought Notice Steam Station Safety Relief Valve
Post-Bid
West Haven, CT 06516

Fire Head Quarters (HQ) Boiler Replacement Design Services
Results
Cheshire, CT 06410

CHMS Boiler Removal and Replacement
Post-Bid
Naugatuck, CT 06770

Boiler Replacements at the Cheshire Fire Headquarters and Fire Headquarters Annex
Results
Cheshire, CT 06410

Western School (WES) Boiler Removal and Replacement
Post-Bid
Naugatuck, CT 06770

Nathanael B. Greene Community Center Boiler Replacement
Results
Guilford, CT 06437

Highland Elementary School Boiler and Domestic Hot Water Replacement
Post-Bid
Cheshire, CT 06410

N045--Install of 90 Thermal Mixing Valves in Building 2
Results
West Haven, CT 06516

Last Updated 10/20/2020 07:53 AM
Project Title

High Plains Community Center Boiler Replacement

Physical Address View project details and contacts
City, State (County) Orange, CT 06477   (New Haven County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $40,160
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Removal of and replacement of one (1) existing, duel fuel Burnham Model V1113 boiler (Boiler #2) including new sections, jacket and canopy. The replacement boiler shall include all equipment and devices that will enable the new boiler to function separately or together as one system. The existing burner will be reused with the other existing boiler (Boiler #1).

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents