Similar Projects
High View at Boulder Creek
New Construction
Conception
Camp Verde, AZ 86322

Fain Property Manufactured Home Park
New Construction
Conception
Dewey, AZ 86327

Jasper Housing Development Phase II
New Construction
Design
Prescott Valley, AZ 86314

Antelope Park Residential
New Construction
Design
Prescott Valley, AZ 86315

Two Single-Wide Manufactured Homes
Results
Seligman, AZ

Jerome Housing Rehabilitation
Results
Jerome, AZ

Copperfield
Construction
Prescott, AZ 86301

Jasper Housing Development Phase 1
New Construction
Construction
Prescott Valley, AZ 86314

Craftsman Court
New Construction
Pending Verification
Chino Valley, AZ

Century Ranch
New Construction
Conception
Chino Valley, AZ 86323

Park Place Homes
New Construction
Design
Prescott Valley, AZ 86315

Substantial Repairs to three Homes
Results
Prescott, AZ

Multi-Unit Residential Project
New Construction
Construction
Clarkdale, AZ

Wee Hollow Homes
New Construction
Design
Camp Verde, AZ 86322

Repair, Rehabilitation, or Replacement of One (1) Single-Family Housing Unit
Results
Prescott Valley, AZ 86314

Reported 03/13/2019 12:54 PM
Project Title

Owner Occupied Housing Rehabilitation Program (Home Project 306-18 Round 3)

Physical Address View project details and contacts
City, State (County) Prescott Valley, AZ   (Yavapai County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method
Project Status Construction Commenced February 2019
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The Town of Prescott Valley is seeking bids for the repair, rehabilitation, or replacement of three (3) single-family housing units through the Owner Occupied Housing Rehabilitation Program (HOME Project 306-18 Round 3). This work consists primarily of the repair, rehabilitation or possible replacement of single-family site built, manufactured, or mobile homes. Each of the three projects may include, but not be limited to, the following: repair and upgrade of electrical, plumbing, mechanical, insulation, lead based paint abatement and/or removal, and other related repairs for targeted residential units meeting all HUD requirements and local building codes.
Details
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents