Similar Projects
109th Avenue Roadway Improvements - Village of Pleasant Prairie
Infrastructure
Conception
$500,000 est. value
Pleasant Prairie, WI 53158

16th Avenue Extension - TI-19-005 - City of Kenosha
Infrastructure
Conception
$1,500,000 CJ est. value
Kenosha, WI 53140

Uptown Lofts
New Construction - 24,847 SF
Design
$18,000,000 est. value
Kenosha, WI 53143

KJS C-Store
New Construction - 5,727 SF
Design
$5,000,000 est. value
Kenosha, WI 53142

V. Somers, CTH Y, Intersection with CTH A
Infrastructure
Bidding
$2,000,000 CJ est. value
Kenosha, WI 53140

V. Somers, CTH Y, Intersection with CTH A
Infrastructure
Bidding
$2,000,000 CJ est. value
Kenosha, WI 53140

Kwik Trip #597
New Construction - 13,000 SF
Post-Bid
Somers, WI 53177

2021 Village Seal Coating Program
Infrastructure
Post-Bid
Salem, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Paving Program Phase 1
Results
Pleasant Prairie, WI

Puma Outlet
Renovation - 6,306 SF
Construction
$345,675 est. value
Pleasant Prairie, WI 53158

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Kenosha Innovation Neighborhood
New Construction
Pending Verification
$4,900,000 est. value
Kenosha, WI

14th Avenue Apartments
New Construction, Infrastructure
Pending Verification
$16,500,000 CJ est. value
Kenosha, WI 53143

19th Avenue Extension - TI-19-006 - City of Kenosha
Infrastructure
Conception
$1,500,000 CJ est. value
Kenosha, WI 53140

Last Updated 11/21/2022 11:02 AM
Project Title

Kwik Trip #975 / Kenosha

Physical Address View project details and contacts
City, State (County) Kenosha, WI 53142   (Kenosha County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Car Wash, Paving/Reconstruction, Retail, Site Development
Contracting Method To Subcontract, Bids by Invitation
Project Status Construction complete as of June 2021 , Construction start expected June 2020
Bids Due View project details and contacts
Estimated Value $1,550,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the demolition and reconstruction of an existing gas station and convenience store. Construction has been completed. The owner was also the general contractor. *This project has been updated for historical data and reference purposes. The information has been provided as it was received and confirmed.

Details

1 Story Above Grade, 7,370 SF.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents