Similar Projects
Mustang Bayou Bank Repair at National Oaks Park
Bidding
Alvin, TX 77511

Reservoir Liner Replacement
Term Contract
Bidding
$100,000 to $250,000 est. value
College Station, TX 77845

Improvements to Cathodic Protection System for Bulkhead at Berths 3 & 4
Post-Bid
Port Arthur, TX 77640

Corrugated Culverts
Post-Bid
Bellville, TX 77418

Exploration Green Detention Facility Phase 3A
Results
Less than $5,520,000 est. value
Clear Lake City, TX 77058

Provide Super 2 Passing Lanes
Results
Less than $17,743,517 est. value
TX

Denbury West Tract Drainage Channel, Phase 1
Infrastructure
Bidding
TX

South Old Spanish Trail Drainage Improvement Project
Post-Bid
Less than $189,559 est. value
Uhland, TX 78640

Water, Sanitary Sewer, and Drainage Facilities to Serve Pollard Boulevard Phase 2
Results
TX

Drainage and Road Improvements in the Castlewood Subdivision Sections 3 and 4, Precinct 2
Infrastructure
Bidding
Houston, TX

Water and Sediment Control Basin Site K-9
Post-Bid
Less than $300,000 est. value
Kerrville, TX 78028

Central Drive Pond Outfall Modification & Oyster Creek Weir at Dulles Modification
Results
Less than $137,000 est. value
Sugar Land, TX

Construction of the Drainage Improvements to Serve Pecan Ridge
Infrastructure
Bidding
TX

Saddlecreek Phase 13 - Water, Wastewater, and Drainage Improvements
Post-Bid
Georgetown, TX 78626

Lost Hills Low Water Crossing
Results
$140,000 est. value
Elmendorf, TX 78112

Last Updated 06/15/2021 10:55 AM
Project Title

Dry Creek Bridge Erosion Repair Project

Physical Address View project details and contacts
City, State (County) Cedar Creek, TX 78612   (Bastrop County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Erosion repair at the Dry Creek Bridge which is located in the 400 Block of Colorado Drive (Rivers Crossing Subdivision). The TxDOT off system bridge crossing at Dry Creek has suffered multiple periods of extreme erosion over the past six years due to multiple flooding events. This bridge is in need of immediate erosion control repair to consist of replacing concrete riprap on the Northwest side of the bridge and replacement of stone riprap under the bridge itself. Because of undermining, the approaches to the bridge have had excessive settling and will require additional flowable backfill estimated at 1.0 CY per Abutment end, for an estimated total of 4.0 CY. The awarded contractor will be required to remove approximately 16 feet of existing concrete riprap flume from the Northwest side of the Dry Creek Bridge. For safety purposes contractor shall change the existing 1:1 slope to a 4:1slope. Upon completion of the slope improvement, contractor will then place 18" stone rip rap in accordance with TXDOT Spec Item 4326051, RIPRAP (STONE COMMON) (GROUT) (l8 IN) over an area of 50' wide and extending 15' below the bridge abutment.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents