Similar Projects
Gateway Park
Renovation
Bidding
$400,000 est. value
Buffalo, NY 14226

Electronic Partition and Bleacher Inspections and Minor Repairs
Term Contract
Post-Bid
Buffalo, NY

Hank Nowak Park Improvements, Group 1010
Renovation
Post-Bid
$87,000 est. value
Buffalo, NY 14211

Clearfield Splash Park Replacement
Results
Williamsville, NY

Riverside Ice Rink Renovations
Renovation
Results
Buffalo, NY 14207

Albright-Knox Gundlach Art Museum AK360 Expansion
New Construction - 29,000 SF
Construction
$155,000,000 est. value
Buffalo, NY 14222

Empire State Trail GAP Funding Project, Group 1011
Infrastructure
Post-Bid
Buffalo, NY

Sheridan Park Ball Diamond Improvements
Renovation
Results
Tonawanda, NY 14150

Legion Field Revitalization
Infrastructure
Post-Bid
Hamburg, NY 14075

Collins Park, J.H. Williams Park and Perkins Park Improvements, Group 993
Renovation
Results
Buffalo, NY 14207

CDBG Projects - North Central Waterline Replacement and Eaton Park Improvements
Renovation
Results
NY

Basketball Court Renovations - Clearfield Recreation Center and Briarhurst Park
Renovation
Results
Buffalo, NY 14221

Williamsville Junior Football (WJF) Proposed Football Fields
Infrastructure
Results
East Amherst, NY 14051

Lou Gehrig Baseball Field Improvements
Infrastructure
Results
East Amherst, NY 14051

Amherst Girls Softball Fields
Infrastructure
Results
Buffalo, Williamsville, NY 14221

Reported 02/04/2022 12:00 AM
Project Title

Cayuga Creek Park and Trail

Physical Address View project details and contacts
City, State (County) Lancaster, NY   (Erie County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $1,400,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of, but is not limited to, the demolition of a portion of an existing retaining wall, roadway milling and full depth excavation, as well as asphalt removal. Along with pavement removal, a portion of an existing concrete sidewalk and nearby guiderail will be removed and replaced. Various trees along the embankment are also expected to be removed. New work is as described, but not limited to, a significant amount of regrading for future open lawn/park space (topsoil; seed), planted landscaped beds (canopy and understory trees, perennials, plant grade topsoil, and mulch) and an 8’ wide asphalt pathway (6” subbase and 4” asphalt). New concrete sidewalk, curbs, ADA ramps, stairs and raised planters will make up the Terrace area of the park; this includes, handrails, fencing, subbase, topsoil, understory trees, perennials, mulch lawn seed and Corten steel sheet panels.

Details

Park/Playground, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 26 - Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Raceway and Boxes for Electrical Systems, Exterior Lighting.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Excavation and Fill, Erosion and Sedimentation Controls, Shoring.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents