Similar Projects
Renovations to Well 2
Post-Bid
Irondale, AL 35210

Hot Water Pump Repair
Post-Bid
Montgomery, AL 36109

N--Replace Pump/Engine on Upland at Eufaula
Results
$90,000 to $110,000 est. value

N--Replace Pump/Engine on Upland at Eufaula
Results
$90,000 to $110,000 est. value

J--Chiller Plant Pump Rebuild
Post-Bid
Montgomery, AL 36109

Waste Water Treatment Six Inch Pump
Results
Less than $38,955 est. value
Alexander City, AL 35011

Contract 1 - Test Well and Gravel Filter Finish Production Well (Well No. 6 - Red Springs Well)
Post-Bid
Gilbertown, AL

New Drinking Water Well, Talladega National Forest
Results
$25,000 to $100,000 est. value
Heflin, AL 36264

Lott Road Well and Snow Road Well Replacement
Post-Bid
Citronelle, AL 36522

Chilled Water Pumps/Valves Phase 3
Results
Less than $92,955 est. value
Huntsville, AL 35801

New Water Supply Well on Pea Ridge Road in Association with Provalus
Post-Bid
Less than $1,200,000 est. value
Brewton, AL 36426

Screw Pump Replacement Phase 1
Results
Loxley, AL 36551

Water Supply Improvements (Contract B)
Post-Bid
Irvington, AL 36544

Submersible Wastewater Pumps and Dry Pit Submersible Wastewater Pumps
Term Contract
Results
Huntsville, AL 35801

Diagnose/Repair- Molnar/Houston/Upland
Post-Bid
Eufaula, AL 36027

Last Updated 08/14/2020 11:59 AM
Project Title

Primary Solids Handling Pump Modifications for Hilliard Fletcher Wastewater Treatment Plant

Physical Address View project details and contacts
City, State (County) Tuscaloosa, AL   (Tuscaloosa County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $576,836
Plans Available from Architect/Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

A. The Project shall be known as Primary Solids Handling Pump Modifications for Hilliard Fletcher Wastewater Treatment Plant and the general character of said public works project shall consist of the following: The project shall include the installation/replacement of three (3) Vaughan chopper pumps, two (2) Penn Valley primary sludge pumps. Also included shall be the installation/replacement of associated mechanical piping, electrical work, and minimal site work. B. The approximate quantities of said Project are as follows: Installation of three (3) Vaughan Chopper Pumps Installation of two (2) Penn Valley Primary Sludge Pumps. C. Special instructions are as follows: Coordinate with the owner during installation process. Necessary shut down times of any existing equipment at the Wastewater Plant shall be coordinated with Josh Bonner with the City of Tuscaloosa. D. The City will furnish the following: Three (3) Vaughan Chopper Pumps Two (2) Penn Valley Primary Sludge Pumps.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents