Similar Projects
New Water Treatment Plant
New Construction
Design
Lancaster, OH

Water Treatment Plant WTP Improvements
Renovation
Bidding
$4,300,000 est. value
Lucasville, OH 45648

Water Treatment Plant (WTP) Filter Media Replacement project
Renovation
Bidding
$195,000 est. value
Saint Henry, OH

Filter Renovation
Post-Bid
Fairfield, OH 45014

Water Treatment Plant Improvements
Renovation
Post-Bid
Bellaire, OH

Water Treatment Facilities Filter Effluent Valve Replacement
Results
Less than $49,600 est. value
Ironton, OH 45638

Lawrence Street Water Pollution Control Facility Improvements Project
Results
Less than $18,728,560 est. value
Lancaster, OH 43130

Choctaw Lake Water Treatment Plant
New Construction - 2,084 SF
Construction
$1,870,000 est. value
London, OH

2020 Water Treatment Plant
New Construction - 38,800 SF
Construction
$40,570,000 est. value
Marysville, OH

Water Treatment Plant (WTP) Filter Media Cleaning
Renovation
Bidding
Troy, OH

Bulk Potable Water Purchase and Ownership, Operation and Maintenance of the Water System
Infrastructure
Post-Bid
Fairport Harbor, OH

Granular Activated Carbon (GAC) Contactor Media Reactivation
Results
Less than $1,800,000 est. value
Batavia, OH 45103

Guernsey Street Water Treatment Plant
Construction
Less than $26,973,000 est. value
OH

Valley Springs and North Well Field PLC Upgrades
Renovation
Bidding
$360,000 est. value
Beavercreek, OH 45434

Water System Improvements Phase II
Infrastructure
Post-Bid
$549,000 est. value
Windham, OH

Reported 06/11/2022 12:00 AM
Project Title

CSC-22009 Replace Humidifier Water Treatment System

Physical Address View project details and contacts
City, State (County) Columbus, OH 43213   (Franklin County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $50,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Work Includes Removal Of Existing Reverse Osmosis (Ro) System With A Newcomplete Industrial-type Packaged Reverse Osmosis (Ro) Water Treatment System Producing High Purity Water By Removal Of Dissolved Minerals, Bacteria, Particles And Organic Impurities. Designed For Continuous Automatic Operation. Work Includes Allincidental Related Work. 1.2.2 Location The Work Is Located At The Defense Supply Center Columbus, Building 23. 1.3 Contract Drawings The Following Drawings Accompany This Specification And Are A Part Thereof. Drawing No. 4-583 Sheets G-001 Through M-102 1.4 Work Rescheduling Normal Duty Hours For Work Are From 7 A.m. To 4 P.m., Monday Through Friday. Requests For Additional Work Requires Written Approval From The Contracting Officer 7 Days In Advance Of The Proposed Work Period.

Details

Water Treatment Plant, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents