Similar Projects
Parks River Center Pool Flooring
Renovation
Design
$60,000 CJ est. value
Benton, AR 72015

Concrete Floor Staining, Polishing, and Sealing
Post-Bid
Cabot, AR

Stripping and waxing all VCT Flooring on Campus
Post-Bid
Quitman, AR

Z1DA--564-21-3-632-0001 - Proj. 564-19-601 Replace Flooring and Expansion Joints
Term Contract
Results
$250,000 to $500,000 est. value
Fayetteville, AR 72703

Removal and Installation of Flooring
Term Contract
Results
$25,000 to $100,000 est. value
Jacksonville, AR 72078

First Floor Window Replacement
Alteration
Post-Bid
Helena, AR 72342

MWTL New Flooring
Term Contract
Results
Ashdown, AR

Polished Concrete Bid
Alteration
Post-Bid
Dover, AR

Remove And Replace Flooring At Central Fire Station - First Floor
Alteration
Results
Hot Springs, AR

Responsive Education Solutions - Installation of Floor Tile
Term Contract
Post-Bid
Bentonville, AR 72712

Gym Polished Concrete Bid
Alteration
Results
$200,000 est. value
Dover, AR 72837

S--Replace Carpet in the Administration Building
Term Contract
Post-Bid
Hot Springs, AR 71901

Carpet Replacement at Various Schools
Alteration
Results
$40,000 est. value
Magnolia, AR

Flooring Replacement at Gloster Court
Alteration
Post-Bid
Malvern, AR

Flooring and Tile Installation Services
Alteration
Post-Bid
Pine Bluff, AR

Last Updated 09/30/2022 11:05 AM
Project Title

Flooring Replacement

Physical Address View project details and contacts
City, State (County) Branch, AR 72928   (Franklin County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $403,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of flooring in accordance with the specifications and instructions to bidders prepared by an official of the school district or its agent, A bid bond in the amount equal to 5% of the total bid must accompany the bid as a guarantee that if awarded the contract, the bidder will promptly enter into a contract with the County Line School District, as outlined in the specifications and instructions to bidders. Davis- Bacon wage rules will apply to this project. A performance and payment bond in the amount of 100% of the contract price will be required if the bids are more than $35,000. No substitute will be acceptable in lieu of the performance and payment bond. The owner reserves the right to reject any and/or all bids.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents