Last Updated | 11/18/2022 08:31 PM |
Project Title | WWTP Gravity Sludge Thickener No. 1 Equipment Replacement |
Physical Address | View project details and contacts |
City, State (County) | Warrenton, VA 20186 (Fauquier County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected December 2022 |
Bids Due | View project details and contacts |
Estimated Value | $150,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Town of Warrenton is seeking qualified contractors to provide and install all materials necessary for the replacement of the sludge thickener equipment at the Wastewater Treatment Plant as specified in the attached. All inquiries for information regarding procurement procedures, proposal submission requirements, or other fiscal/administrative concerns shall be directed to: Lynn Aiani, Purchasing Agent 21 Main Street Warrenton, VA 20186 email: procurement@warrentonva.gov Phone: 540-347-1101 For technical information relating to this RFP, please contact: Paul Bernard, PE, Town Engineer Public Works & Utilities 21 Main Street Warrenton, VA 20186 Phone: 540-347-1101 Fax: 540-349-2414 email: pbernard@warrentonva.gov In compliance with this Request for Proposal and all the conditions imposed herein, the undersigned offers and agrees to furnish the goods and/or services in accordance with the signed proposal or as mutually agreed upon by subsequent negotiations. The Town of Warrenton is currently seeking proposals from qualified mechanical contractors to provide and install all materials necessary for the replacement of the gravity sludge thickener equipment at the Wastewater Treatment Plant located at 731 Frost Avenue, Warrenton, Virginia. This work will include the pumping out of existing sludge, proper disposal of this sludge at a qualified wastewater treatment facility, cleaning of the existing tank, coating of the tank and the fabrication and replacement of old equipment. The selected contractor will be responsible for coordinating with the Wastewater Treatment Operations personnel while this tank if offline, and to be responsible for pumping, hauling, and disposal of sludge material while this facility is offline. During this work, the contractor will need to remove the existing 28-foot fiberglass cover and replace it once completed. The due date for submitting questions related to this RFP will be Wednesday, October 26, 2022 at 4:30 pm. Any questions submitted on or before Wednesday, October 26, 2022 at 4:30 pm will be answered and uploaded electronically. It is the responsibility of the Offeror to check electronically prior to the due date for any issued Addenda and to submit with their proposal any and all Addenda acknowledgments signed by an individual authorized to sign on behalf of their organization. All aspects of this project must be substantially completed no later than one hundred eighty (180) calendar days from date of award. |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |