Similar Projects
Deer Creek Plant Improvements - 20600 North Portland Avenue (Ward 8) - City Of Oklahoma City
Renovation
Conception
$1,546,000 est. value
Edmond, OK 73012

Kenwood Hills Water System Improvements- Construction - WL1903 - City of Broken Arrow
Renovation
Conception
$428,000 est. value
Broken Arrow, OK

Mingo 20
New Construction
Design
Tulsa, OK 74127

Sharp Development 360 HQ
New Construction
Design
$2,221,269 est. value
Tulsa, OK 74119

2021 CDBG Wastewater Treatment Improvements- Phase I
Renovation
Bidding
$500,000 CJ est. value
Grandfield, OK 73546

Bixby Zone Creek County Rural Water District No. 2
Renovation, Infrastructure
Bidding
$325,000 CJ est. value
Bixby, OK 74008

Sheridan Road Booster Pump Station
Infrastructure
Post-Bid
Collinsville, OK 74021

Guymon Lift Station 6 Replacement Project
Renovation
Post-Bid
Guymon, OK

Construction of Moore Parks Storage Building
New Construction
Results
Moore, OK

Atoka Pump Station Vault and Duct Bank Replacement
Alteration
Results
$968,629 est. value
Oklahoma City, OK

Community Food Bank of Eastern Oklahoma
Renovation, Addition - 132,500 SF
Construction
$17,000,000 to $20,000,000 est. value
Tulsa, OK 74106

Integrated Office Building
New Construction - 32,111 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Edmond, OK 73013

121st & Elm Complex - A Commercial
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Jenks, OK 74037

A Safe Place Mini Storage
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Sand Springs, OK 74063

Hai Key Creek Lift Station Phase 3 Force Main - Construction - HC1802 - City of Broken Arrow
Renovation
Conception
$561,360 est. value
Broken Arrow, OK

Last Updated 04/18/2023 09:10 AM
Project Title

Ardmore Airpark Waste Water Treatment Plant Improvements

Physical Address View project details and contacts
City, State (County) Ardmore, OK 73401   (Carter County)
Category(s) Commercial, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant, Warehouse/Storage
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $8,232,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes the furnishing of labor, equipment and materials to construct a new mechanical waste water treatment plant to include influent and effluent lift stations with forcemains, sequential batch reactor process, mechanical bar screen, chlorination and de-chlorination equipment, yard piping, electrical, controls, a pre-engineered metal building, an d other additional items necessary for a complete & functional installation. Each Bid must be accompanied by a BID BOND payable to the OWNER for Five Percent (5%) of the total amount of the BID. A certified check may be used in lieu of a BID BOND. PERFORMANCE, MAINTENANCE AND STATUTORY PAYMENT BONDS in the amount of one-hundred percent (100%) of the Contract Price, with a corporate surety approved by the OWNER, will be required for the faithful performance of the contract. The OWNER may waive any informalities or minor defects or reject any and all BIDS. Any BID may be withdrawn prior to the above scheduled time for the opening of BIDS or authorized postponement thereof. Any BID received after the time and date specified shall not be considered. No BIDDER may withdraw a BID within sixty (60) calendar days following the actual date of the opening thereof. The OWNER reserves the right to: change dates the bid will be considered; waive all informalities; reject any and all bids; choose whether to accept alternates, if applicable; adjust quantities; and add or omit items of work as deemed necessary to conform with budget or other constraints; and to accept that bid deemed most advantageous for value received. Bids shall be made in accordance with the Instructions for Bidders contained in the Contract Documents.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware, Door Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents