Similar Projects
Saint Andrew School Site Improvements
Renovation
Conception
Middletown, DE 19709

Two New Interconnected Middle Schools
Design
Less than $115,670,000 est. value
Dover, DE

Ursuline Academy Parking Lot Addition
New Construction, Renovation
Design
Wilmington, DE 19806

Toilet Room Renovation at Mount Pleasant High School
Renovation, Demolition
Bidding
Wilmington, DE 19809

NHS Auditorium ADA Renovations
Renovation
Bidding
Newark, DE 19711

Cape Henlopen High School Band Room Renovation
Renovation
Post-Bid
Lewes, DE 19958

Delaware State Fire School Building – Bathroom Renovations
Renovation
Results
Dover, DE 19904

CSD - MSHA Health Science Lab Renovations
Renovation
Results
Bear, DE 19701

Cape Henlopen High School Additions
Addition
Construction
Lewes, DE 19958

Appoquinimink School District – Everette Meredith Middle School
New Construction, Demolition - 83,000 SF
Construction
Middletown, DE 19709

Brandywine High School Renovations Phase III
Renovation
Results
Wilmington, DE

Howard T Ennis School – New Special Needs School
New Construction - 94,500 SF
Construction
Less than $45,000,000 est. value
Georgetown, DE 19947

GC Services Facilities
Renovation, Addition - 6,900 SF
Results
Claymont, DE 19703

New Construction of Capital Middle School
New Construction
Construction
Less than $11,567,000 est. value
Dover, Dover AFB, DE 19904

New Sussex Central High School Construction Management Services
New Construction - 309,799 SF
Results
Less than $146,094,000 est. value
Georgetown, DE 19947

Last Updated 04/23/2021 08:59 AM
Project Title

NHS Auditorium Renovations

Physical Address View project details and contacts
City, State (County) Newark, DE 19711   (New Castle County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,043,900
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the project involves renovating the existing Lighting and Sound system in the existing Auditorium. Renovations will include new entry lobby lighting, new lighting over the main Auditorium and Stage. The new sound system will include new speakers and new sound board/controls. Construction of a new interior non-loadbearing stud wall will create new control room space on the second floor to house all of the new equipment. The Work is intended to be performed during the 2021 summer break.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 05 - Metals, Cold-Formed Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Miscellaneous Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Firestopping, Penetration Firestopping, Joint Sealants.
Division 09 - Finishes, Integrated Ceiling Assemblies, Painting, Interior Painting.
Division 12 - Furnishings, Casework.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents