Similar Projects
Pre-Event Emergency Roadside Assistance Services
Bidding

Pre-Event Emergency Roadside Assistance Services
Bidding

2020 CDBG Road Resurfacing Project Clough Avenue and Sherry Lane
Post-Bid
Lake Helen, FL 32744

Elkcam Boulevard Paved Shoulders - Segment 1
Post-Bid
Less than $1,178,301 est. value
Deltona, FL 32725

Traffic OPS Improvement
Results
Less than $1,000,000 est. value

Turtlemound Road Roadside Repair
Results
Less than $112,390 est. value
New Smyrna Beach, FL 32169

Longleaf Pine Preserve Trail Road Improvements
Bidding
$157,000 est. value
FL

Roadway Repair
Results
Less than $350,000 est. value
FL

Countywide Resurfacing 2021
Bidding
Less than $5,600,000 est. value
FL

10th Street Widening
Results
Less than $9,500,000 est. value
De Land, FL 32720

Asphaltic Concrete and Removal of Surfaces by Milling
Term Contract
Results
De Land, FL 32720

Citywide Paving Program
Results
Less than $800,000 est. value
Port Orange, FL 32129

Howland Boulevard Widening
Results
Less than $14,000,000 est. value
Deltona, FL

Concrete Roadway Repair
Results
Less than $950,000 est. value
FL

Spring to Spring Trail - Deleon Springs
Results
Less than $1,040,000 est. value
FL

Last Updated 04/05/2020 11:59 PM
Project Title

Orange Camp Road Widening

Physical Address View project details and contacts
City, State (County) De Land, FL 32720   (Volusia County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $11,178,794
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Professional contractors to provide construction services for the widening of Orange Camp Road. The scope of services shall consist of, but not limited to: 1. The widening of Orange Camp Road from two lanes to four lanes from East of Blue Lake Avenue to West of Interstate 4, including the conversion of the Orange Camp Road and Martin Luther King Jr. (MLK) Beltway signalized intersection to a roundabout. 2. MLK Beltway will also be widened from two lanes to four lanes approximately 1500 to 2000 North and South of the intersection with Orange Camp Road. 3. A round-a-bout will be constructed at the intersection of Orange Camp Road and Martin Luther King Boulevard.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents