Similar Projects
Reported | 10/14/2021 12:00 AM |
Project Title | Water Works Improvements |
Physical Address | View project details and contacts |
City, State (County) | Brazil, IN (Clay County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Storage/Water Tanks |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | For the construction of a new Elevated Water Storage Tank and new Water Booster Station to serve the City’s Industrial Park. The Project will be constructed in one (1) single prime contract, which is outlined in the construction documents and specifications. This contract consists of the construction of a new 300 gpm water booster station and new 100,000 gallon elevated water storage tank of the multiple column design. The project also includes SCADA system improvements, electrical work, connections to existing water mains, and approximately 1,500’ of new water main, together with all associated valves, fittings, hydrants, disinfection, testing and startup to provide a complete and operational system. |
||||||||||||||
Details |
|
||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |