Similar Projects
Bird Creek Detention Pond - City of Temple
Infrastructure
Conception
$3,043,000 est. value
Temple, TX

Little Elm Trunk Sewer North East Extension - City of Temple
Infrastructure
Conception
$1,400,000 est. value
Seaton, TX 76501

Starbucks - Build Out
Build-Out - 2,390 SF
Design
Killeen, TX 76549

Apache Drive Sidewalk Improvements - City of Temple
Infrastructure
Design
$413,167 est. value
Temple, TX 76504

FM 436 - Hazard Elimination and Safety
Infrastructure
Bidding
$1,891,533 CJ est. value
Belton, TX 76513

FM 436 - Hazard Elimination and Safety
Infrastructure
Bidding
$1,891,533 CJ est. value
Belton, TX 76513

Target #T2278 - Beverage Bar Removal
Renovation, Demolition
Post-Bid
Temple, TX 76504

New Parking Lot at City Hall
Post-Bid
$380,000 to $415,000 est. value
Nolanville, TX 76559

Construction of E. Avenue H Improvements - Mesquite to Jackrabbit
Results
Nolanville, TX

Adams and Central Avenue Pedestrian Infrastructure Improvements
Results
$905,332 est. value
Temple, TX 76501

Knob Creek Basin Wastewater Projects
Infrastructure
Pending Verification
$28,930,000 est. value
Temple, TX

Beyond the Bend Mixed Use
New Construction, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Temple, TX 76502

14th Street - Connector to Ferguson Park (Crestview District) - City of Temple
Infrastructure
Conception
$1,800,000 est. value
Temple, TX 76501

Dutch Bros Coffee / Harker Heights (TX1006)
New Construction, Infrastructure - 950 SF
Design
Less than $550,000 est. value
Harker Heights, TX 76548

SH 195 - Hazard Elimination and Safety
Infrastructure
Bidding
$536,740 CJ est. value
Killeen, TX 76549

Last Updated 07/25/2022 05:01 PM
Project Title

Starbucks / Belton

Physical Address View project details and contacts
City, State (County) Belton, TX 76513   (Bell County)
Category(s) Commercial, Heavy and Highway, Sewer and Water
Sub-Category(s) Food/Beverage Service, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans consist of a shell construction of a standalone Starbucks restaurant. Foundation will be slab on grade with wood construction. Site improvements include driveways, sidewalks, utilities, signage, and partial MEP. As of July 25, 2022, a building permit has been issued. The identity of the general contractor has not been disclosed. A construction start date has not been disclosed.

Details

2,390 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents