Similar Projects
Illinois Bridge Pedestrian Crossing Improvements - City of Mason City
Infrastructure, Alteration
Conception
$200,000 est. value
Mason City, IA

Hangar Pavement Rehabilitation Phase 2 - City of Mason City
Infrastructure
Conception
$340,000 est. value
Mason City, IA

2022 HMA Alley Reconstruction Project
Infrastructure
Design
$57,000 CJ est. value
Clear Lake, IA 50428

2022 HMA Alley Reconstruction Project
Infrastructure
Design
$57,000 CJ est. value
Clear Lake, IA 50428

Lead Based Paint Hazard Control Program Project(LBPHC) - 643 S Louisiana Avenue
Term Contract, Infrastructure
Sub-Bidding
$20,000 CJ est. value
Mason City, IA 50401

Lead-Based Paint Hazard Control Program Project
Term Contract, Infrastructure
Sub-Bidding
$20,000 CJ est. value
Mason City, IA 50401

2022 Street Rehabilitation Program
Infrastructure
Post-Bid
Mason City, IA

2022 Street Panel and Curb Replacement Program
Infrastructure
Post-Bid
Mason City, IA

River City Renaissance Utilities
Infrastructure
Results
$211,250 est. value
Mason City, IA

2021 Alley Reconstruction Project
Infrastructure
Results
Clear Lake, IA

Highway 122 Reconstruction - City of Mason City
Infrastructure
Conception
$11,150,000 est. value
Mason City, IA 50402

2022 Street Resurfacing Project : Division 1
Infrastructure
Design
$320,000 CJ est. value
Clear Lake, IA 50428

Bridge Deck Overlay
New Construction
Results
IA

U.S. 65 Reconstruction - City of Mason City
Infrastructure
Conception
$3,310,000 est. value
Mason City, IA 50402

HMA Resurfacing
Infrastructure
Results
IA

Last Updated 08/08/2022 04:32 PM
Project Title

2022 Multi-Bridge Repair Project

Physical Address View project details and contacts
City, State (County) Mason City, IA 50401   (Cerro Gordo County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $126,720 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The extent of the work involved is the furnishing of labor and new materials required for repairs that include: replace handrails on bridge on Pierce Ave. NW over Willow Creek, replace expansion joint material and reset abutment bearing on bridge on 19th St. SW over UP Railroad, approach repair and joint material replacement on bridge on 12th St. NW over UP Railroad, and other misc. repairs.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents