Similar Projects
Wisdom Academy Phase I
New Construction - 12,600 SF
Design
$1,000,000 est. value
Carrollton, TX 75006

Career Institute North at Walnut Hill
New Construction
Sub-Bidding
Less than $2,000,000 est. value
Dallas, TX 75229

Brentfield Elementary Additions and Renovations
Renovation, Addition
Sub-Bidding
TX 75248

McWhorter Elementary School Maintenance Package
Renovation
Post-Bid
Dallas, TX 75287

Cannaday Elementary School Addition
Addition
Post-Bid
Mesquite, TX

Jill Stone Elementary School
New Construction
Results
Less than $27,634,000 est. value
Dallas, TX 75231

Nathaniel Hawthorne Elementary School New Construction
New Construction
Results
$26,500,000 est. value
Dallas, TX 75217

Wilmer Elementary School - New
New Construction - 83,720 SF
Construction
$22,745,620 est. value
Wilmer, TX 75172

Alex Sanger Elementary School Classroom Addition and Renovation
Renovation, Addition
Construction
$14,456,710 est. value
Dallas, TX 75218

Job Order Contracting Services Districtwide
Renovation
Post-Bid
Dallas, TX 75219

Lorenzo DeZavala Elementary School Renovations
Renovation
Results
$3,176,097 est. value
Dallas, TX 75212

Steamspark Montessori School
New Construction - 13,000 SF
Construction
$2,000,000 est. value
Farmers Branch, TX 75234

Whitt Elementary Bus Loop Drive Expansion
Post-Bid
Sachse, TX 75048

Nathan Adams Elementary School - Renovation
Renovation
Results
$4,416,600 est. value
Dallas, TX 75244

Golden Rule Charter School Campus Improvements
Addition
Construction
$6,500,000 est. value
DeSoto, TX 75115

Last Updated 12/16/2020 10:10 AM
Project Title

Daniel Webster Elementary Addition and Renovation

Physical Address View project details and contacts
City, State (County) Dallas, TX 75233   (Dallas County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $8,502,005
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Front Entry Addition and Renovation: A new secure front entry vestibule will be provided at the main entry. Existing offices will be renovated to provide new reception and administration spaces. Landscaping improvements and accessible route to the entry will be provided. 2. Kitchen Addition and Cafeteria Renovation: A new kitchen addition will be provided adjacent to the existing cafeteria. The kitchen addition will provide new two-line server and new food service equipment. The existing cafeteria will be renovated and the existing kitchen will be demolished to increase the area of the cafeteria. 3. Existing Building Renovations: Renovations throughout the existing building address life-cycle and educational adequacy improvements to the following areas: playground and vehicular traffic areas, interior finishes, classroom teaching surfaces, interior room and wayfinding signage, window and exterior sealant replacement, exterior painting, new exterior digital marquee, mechanical system replacement, fire alarm system replacement, and security and technology infrastructure. 4. Abatement of hazardous materials in the existing building.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents