Similar Projects
Darboy Community Park 2022 Improvements
Infrastructure
Design
$500,000 CJ est. value
Menasha, WI 54952

Police Department Building Addition - City of Neenah
Addition, Demolition, Infrastructure
Design
$5,500,000 CJ est. value
Neenah, WI 54956

South Koeller Street Concrete Patching
Infrastructure
Bidding
$400,000 CJ est. value
Oshkosh, WI 54902

Water Service Replacement Hunt Avenue, Madison Street, Nicolet Boulevard 2022
Infrastructure
Bidding
$453,000 CJ est. value
Neenah, WI 54956

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

2022 Water Main Replacement
Infrastructure
Post-Bid
$120,000 est. value
Menasha, WI

Phase I Water Main/Utility Construction
Results
Larsen, WI

Knapp Street Area Water Main Replacements
Results
Oshkosh, WI 54902

Construct Fisheries Equipment Storage Facility
New Construction, Infrastructure
Construction
$587,570 CJ est. value
Oshkosh, WI 54901

Construct Fisheries Equipment Storage Facility
New Construction, Infrastructure
Construction
$587,570 CJ est. value
Oshkosh, WI 54901

Aquatic Play Structure Restoration Pollock Community Water Park
Infrastructure
Bidding
$75,000 CJ est. value
Oshkosh, WI 54902

Winneconne Well 1 to Well 2 Low Pressure Transmission Line - Lake Winneconne Crossing
Infrastructure
Post-Bid
$430,000 est. value
Winneconne, WI

AMTC Concrete, Sitework, and Fencing
Results
Oshkosh, WI 54902

Womens Volleyball Team Room Construction
New Construction, Infrastructure - 583 SF
Bidding
$140,000 CJ est. value
Oshkosh, WI 54901

South Park Avenue Sanitary Lift Station 3 Generator Structure
Infrastructure, Alteration
Post-Bid
$500,000 est. value
Neenah, WI 54956

Last Updated 08/25/2022 07:32 PM
Project Title

Water Service Replacement - Reddin Avenue and Zemlock Avenue

Physical Address View project details and contacts
City, State (County) Neenah, WI 54956   (Winnebago County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $147,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Notice is hereby given by the City of Neenah by the undersigned Board of Public Works for this project. Water Service Replacement Reddin Avenue and Zemlock Avenue The above public work will be let to the lowest responsible bidder and shall be performed in accordance with the plans, specifications and contract now on file in the office of the Director of Public Works. No bid shall be received or considered unless accompanied by a certified check equal to five (5) percent of the bid or bid bond in equal amount payable to the City as a guarantee that, if the bid is accepted, the bidder shall execute and file the proper contract and bond within ten days from the date the lowest responsible bid is accepted. In case the bidder fails to file such contract and bond within the time set by the City, the check or bid bond shall be forfeited to the City as liquidated damages. Complete digital project documents are available at QuestCDN. VBid online bidding for submittal of your bid (required for this project). Bidders will be charged a fee of $30.00 to submit a bid electronically. Documents may be examined in the office of the Director of Public Works. Unless previously qualified, Contractors bidding on these contracts shall be prequalified before receiving plans and specifications. Proof of Responsibility forms may be obtained from the Director of Public Works, and shall be filed with him for consideration by the Public Services and Safety Committee not later than 4:00 p.m., August 26, 2022. The City of Neenah is applying to fund portions of this contract through the Safe Drinking Water Loan Program (SDWLP) administered by the Wisconsin Department of Natural Resources. All work in this contract is subsequently subject to the Davis-Bacon Compliance Provisions. All iron and steel products provided by the Contractor shall be produced in the United States and comply with the American Iron and Steel Requirement (AIS). The City of Neenah strongly encourages DBEs, including MBEs and WBEs, to submit bid proposals. The minimum wage scale to be paid on said project by the Contractor is either included in the specifications or on file in the office of the City Clerk in accordance with Section 66.0903, Wisconsin Statutes.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents