Similar Projects
CPFC HVAC 2022
Alteration
Bidding
Westminster, CO 80020

HVAC Control System Upgrade for Arvada Library
Post-Bid
Arvada, CO 80002

HVAC Maintenance Services
Post-Bid
Arvada, Evergreen, Golden, Lakewood, Littleton, Wheat Ridge, CO

Replace Obsolete Control Lakes Library
Results
$225,000 est. value
Golden, CO 80401

Prequalify Mechanical Contractors - Campus Infrastructure, Cp6 Chiller
Results
Less than $1,372,000 est. value
Golden, CO

Infrastructure projects at the Southwest Memorial Hospital
Post-Bid
Cortez, CO 81321

Mechanical, Electrical & Plumbing Construction Services
Results
Golden, CO 80401

HVAC and Mechanical Products
Term Contract
Post-Bid

Remington Building (49RMB) Cooling Tower Replacement
Results
Less than $100,000 est. value
Lakewood, CO 80215

Heat Exchanger
Post-Bid
Golden, CO

Replace HVAC and Lighting Systems
Results
Less than $554,000 est. value
Lakewood, CO 80215

Community Recreation Center HVAC Upgrade
Post-Bid
Arvada, CO 80003

Annual Chiller Maintenance
Term Contract
Results
Lakewood, CO 80232

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Mechanical and Electrical Upgrades at 3 Troop Offices
Results
Less than $62,000 est. value
Lakewood, CO

Last Updated 10/09/2021 02:41 AM
Project Title

Alderson Hall Process Cooling Water System - Mechanical Contractor Prequalification

Physical Address View project details and contacts
City, State (County) Golden, CO 80401   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $395,500
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide a new process cooling water loop and controls for Alderson Hall laboratory spaces and connect to the campus chilled water system via a heat exchanger in the Basement of AH. Prepare shop drawings of the hydronic piping layout. Schedule and manage construction activities in accordance with Mines requirements.This project will add a heat exchanger, pumps, hydronic piping, and HVAC controls. The process cooling loop pathway will extend from the basement to all four floors in Alderson Hall (AH) laboratory spaces.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents