Similar Projects
Construction of Oak Meadows On-Site Wastewater Treatment and Restroom Renovation
Renovation
Bidding
Colorado Springs, CO 80921

Wastewater Treatment Facility Headworks and Clarifier Project
Alteration
Bidding
Basalt, CO 81621

Total Organic Carbon (TOC) Analyzer for Water Reclamation Facility
Post-Bid
Pueblo, CO

Sterling Wastewater System Improvements Bid Package 100 Headworks and Influent Pump Station
Post-Bid
$5,000,000 to $7,000,000 est. value
Sterling, CO

CMGC Chemical Phosphorus & UV Disinfection Project
Results
Englewood, CO 80110

Non-Potable Water Reuse System
Results
Pueblo, CO 81007

Construction Manager at Risk Wastewater Treatment Facility Improvements
Construction
Platteville, CO 80651

Wastewater Treatment Plant Equipment
Post-Bid
Johnstown, CO

WWSD 2020 Capital Improvement Project
Results
Less than $7,650,000 est. value
Monument, CO 80132

Bid Package 300 Sterling Wastewater System Improvements
Post-Bid
$15,000,000 to $20,000,000 est. value
Sterling, CO 80751

Peetz Wastewater Treatment Facility
Results
$1,500,000 to $2,000,000 est. value
Peetz, CO 80747

Rifle Wastewater Reclamation Facility Dewatering Improvements
Post-Bid
Less than $744,000 est. value
Rifle, CO

Center Sanitation District Wastewater Treatment Plant Improvements
Results
Lakewood, CO

Wastewater Treatment Plant Improvements Project
Post-Bid
Grand Junction, CO

ERMD New Sewage Treatment Plant
Results
$6,000,000 to $7,000,000 est. value
Durango, CO 81301

Reported 11/10/2021 12:00 AM
Project Title

Sludge Drying Facility

Physical Address View project details and contacts
City, State (County) New Castle, CO   (Garfield County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer - 09/29/21
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes construction of a sludge drying bed, material drying building, dewatering building, along with minor grading and utility extension for electrical, solids line, water service and decant line.

Details

Sewage Treatment Plant, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents