Similar Projects
South End Development (1901 S. Trumbull St.) - Bay City
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Bay City, MI 48708

Long Rapids Road - Bagley to Arbor - City of Alpena
Infrastructure
Conception
$505,144 CJ est. value
Alpena, MI 49707

Aldi / Alpena
New Construction, Infrastructure
Design
$3,200,000 CJ est. value
Alpena, MI 49707

Library Addition - Elk Rapids District Library
Addition, Infrastructure - 6,320 SF
Design
$1,800,000 CJ est. value
Elk Rapids, MI 49629

Point Betsie Light Station Shoreline Protection System
Infrastructure
Bidding
$100,000 CJ est. value
Frankfort, MI 49635

RFP - Bridge Street Housing Project
New Construction, Infrastructure
Bidding
$600,000 CJ est. value
Elk Rapids, MI 49629

Hot Mix Asphalt Crack Treatment and Overband Crack Fill on Various State Trunkline Routes,
Infrastructure
Sub-Bidding
$565,000 CJ est. value
Baraga, MI 49908

Whirlpool Centennial Park Improvements - City of St. Joseph
New Construction, Infrastructure
Post-Bid
$500,000 CJ est. value
Saint Joseph, MI 49085

New Buffalo Mayhew ROW Sediment Basin
Infrastructure
Post-Bid
New Buffalo, MI

Sea Lamprey Trap (East Branch) Au Gres River, MI
New Construction
Results
$500,000 to $1,000,000 est. value
Au Gres, MI

Plainwell Spillway - Phase 1 Channel Restoration
Infrastructure
Results
Plainwell, MI 49080

2022 Whippoorwill/Greenwood Street Sanitary Sewer and Water Main Improvements and Village-Wide Sanitary Sewer CIPP Project
Infrastructure
Construction
$787,414 CJ est. value
Middleville, MI 49333

CBS Concrete Replacement
Infrastructure
Construction
$597,726 CJ est. value
Bay City, MI 48708

Lakeland Elementary School Improvements - Bond 2020 - Elk Rapids Public School
Renovation, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Elk Rapids, MI 49629

Alcona County Mixed-Use Development
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Lincoln, MI 48742

Last Updated 07/11/2023 03:47 PM
Project Title

Hall Lake Dam Rehabilitation/Gun Lake Road

Physical Address View project details and contacts
City, State (County) Delton, MI 49046   (Barry County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $1,009,145 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Removal of CMP intake structure; slip-lining a CMP barrel culvert; driving foundation piling; construction of concrete intake and outlet structures; regrading outlet channel; construction of graded seepage filter blanket. (Dept. of Corrections ONLY) All contractor/vendor representatives attending a Pre-Bid Walk Through Meeting must submit a Vendor/Contractor LEIN Request five business days prior to the meeting date, (See the attached Vendor/Contractor LEIN Request form). Send the LEIN Request form, filled out and signed, by email to Daniel T. Smith at email address: SmithD76@michigan.gov. The email "Subject" must include (Facility Name, Project Name, Date & Time of Pre-Bid Walk Through Meeting). NOTE: An individual is only permitted to represent one bidder at a mandatory walk-through. Depending on the project location, individuals may be required to wear masks to attend meetings and for a firm to be eligible to submit bids / quotations / proposals. Bring and be prepared to wear a mask if required upon arrival. Requirements may change at any time and any updated guidance. All Bid Attachments MUST be uploaded to SIGMA VSS. Please remember that individual attachments can be no larger than 6 mb o If you experience issues or have questions regarding your electronic submission, bidders must contact the SIGMA Help Desk for assistance. Bidders can contact the Help Desk by calling 888-734-9749 or emailing sigma-procurement-helpdesk@michigan.gov or sigma-vendor@michigan.gov o Please notify the Office of Design and Construction (DCD) if you are having SIGMA VSS issues. Include your SIGMA ticket number in an email to our contract specialists, Anne Watros (watrosa@michigan.gov) and Don Klein (kleind4@michigan.gov ). You may be asked to email your bid package. Emailed submissions require DCD approval and will be handled on a case-by-case basis. Question Deadline 07/05/2023 at 5:00 PM ET

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Erosion and Sedimentation Controls, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents