Similar Projects
Nicollet Ave Apartment Building
New Construction - 73,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Minneapolis, MN 55409

Satori Boutique Apartments
New Construction - 1,161 SF
Design
$34,800,000 est. value
Minneapolis, MN 55411

Target Field Station Parking Ramp Repairs
Renovation, Infrastructure
Bidding
Minneapolis, MN 55401

Painting and Wallcovering Services
Term Contract
Post-Bid
MN

Ramp B Waterproofing and Structural Repairs
Post-Bid
Minneapolis, MN

Logan Recreation Center - Cabinetry and Countertops
Results
$75,000 est. value
Minneapolis, MN 55413

2021 Interior Finish Upgrades
Alteration
Results
Edina, MN

Texas-Tonka Apartments
New Construction - 105,767 SF
Construction
$25,000,000 est. value
Minneapolis, Saint Louis Park, MN 55426

Eide Saw Mixed Use Building
New Construction - 8,222 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Minneapolis, MN 55413

Apartment Development
New Construction
Pending Verification
Minneapolis, MN 55408

The Emi - Mixed Use
New Construction - 53,584 SF
Design
$10,000,000 CJ est. value
Richfield, MN 55423

Handrail
Renovation
Post-Bid
Minneapolis, MN 55450

Deephaven Elementary School Mechanical, Tile and Cabinet Long Term Maintenance
Term Contract, Alteration
Results
Wayzata, MN 55391

Eden Avenue Mixed Use
New Construction - 3,700 SF
Design
$500,000 to $1,000,000 CJ est. value
Edina, MN 55424

LED Lighting Supplies
Infrastructure
Post-Bid

Last Updated 03/28/2022 02:22 PM
Project Title

2022 Parking Structure Rehabilitation and 2022 Parking Ramp Railing Refinishing

Physical Address View project details and contacts
City, State (County) MN   (Hennepin County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Finishes/Interior, Parking Garage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Targeted Group Businesses on this project is 9%. 2022 Parking Structure Rehabilitation includes miscellaneous repairs and maintenance to the parking structure facilities at Terminal 1 and Terminal 2 at the Minneapolis-St. Paul International Airport. The work includes miscellaneous concrete repairs, expansion joint replacement, construction joint rehabilitation, water repellant placement, floor drain replacement, parking stall striping, aluminum storefront, miscellaneous plumbing repairs, and miscellaneous electrical work. 2022 Parking Ramp Railing Refinishing includes repairs and maintenance to the railings at Terminal 1 at the Minneapolis-St. Paul International Airport. The work includes removing existing railings from the parking structure, installing temporary fence, blasting and repairing railings at an off-site facility, steel fabrications, blasting and repainting railing posts in place, and reinstalling the railings.

Details

Parking Garage, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents