Similar Projects
Madison Chocolate Company
Build-Out, Alteration - 3,125 SF
Design
Madison, WI 53719

Braxton Pl Resurfacing and La Mariposa Lane (New Street)
Infrastructure
Design
$900,000 est. value
Madison, WI

Olin-Turville Court and East Lakeside Street Resurfacing Water Utilities
Infrastructure
Bidding
$700,000 est. value
Madison, WI 53715

Lake Mendota Drive and Capital Avenue Reconstruction
Infrastructure
Bidding
$500,000 est. value
Madison, WI 53705

Crushed Aggregate
Renovation
Post-Bid
Dane, WI

Road Work
Post-Bid
Verona, WI

Winnequah Road Bridge Replacement
Results
Monona, WI

HMA Pavement
Results
WI

Promega Kepler Warehouse
Addition, Infrastructure - 135,000 SF
Construction
Fitchburg, WI 53711

Walking Path Rock Removal
Alteration
Construction
$111,240 est. value
Madison, WI 53715

Safe Streets Madison 2022 - Group 2
Infrastructure
Bidding
$700,000 est. value
Madison, WI

Road Repairs
Post-Bid
WI 53572

Garver Path and Starkweather Drive Assessment
Results
Less than $2,370,000 est. value
Madison, WI 53714

Torpedo Sand
Infrastructure
Bidding
Madison, WI

2021 Road Paving
Post-Bid
McFarland, WI

Last Updated 06/14/2022 11:32 PM
Project Title

North Mendota Trail East Segment

Physical Address View project details and contacts
City, State (County) Middleton, WI 53562   (Dane County)
Category(s) Heavy and Highway
Sub-Category(s) Aggregates, Landscaping, Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $350,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes the construction of a multi-use path along Century Avenue (CTH M) from Highland Way to Signature Drive, including approximately 3,380 lineal feet of 10' path comprised of asphalt pavement surface. The project includes multiple Versa-Lok block retaining walls, concrete curb ramps, grading, erosion control, restoration, and other miscellaneous items in conformance to the Contract Documents. There is also an alternative for paving and restoration of the existing multi-use path along the Pheasant Branch Conservancy between Branch St. and Middleton Springs Dr. This includes approximately 695 lineal feet of 10' path comprised of asphalt pavement surface and shoulder restoration. Preliminary construction of this path segment was completed in 2020

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents