Similar Projects
Willow Glen Wash Bay Addition - RB0218-03008 - Flathead County
Addition, Demolition, Renovation, Infrastructure
Conception
$1,026,250 CJ est. value
Kalispell, MT 59901

Kay Beller Park to BNSF Loop Trail - City of Whitefish
New Construction, Infrastructure, Renovation
Conception
$2,100,000 CJ est. value
Whitefish, MT 59937

The Charles Hotel
New Construction, Infrastructure - 86,000 SF
Design
$34,000,000 CJ est. value
Kalispell, MT 59901

The Charles Hotel
New Construction, Infrastructure - 86,000 SF
Design
$34,000,000 CJ est. value
Kalispell, MT 59901

WWTP Main & Headworks Structure
Infrastructure
Bidding
$8,000,000 CJ est. value
Kalispell, MT 59901

WWTP Main & Headworks Structure
Infrastructure
Bidding
$8,000,000 CJ est. value
Kalispell, MT 59901

BMP Pipe Maintenance Construction Project
Renovation, Alteration
Post-Bid
MT 59901

HRDC Community First Griffin Place Site and Infrastructure
Demolition, Infrastructure
Post-Bid

2021 Water System Improvement Project
Infrastructure
Results
$4,499,772 CJ est. value
Bigfork, MT 59911

2021 Water System Improvement Project
Infrastructure
Results
$4,499,772 CJ est. value
Bigfork, MT 59911

Kalispell City Airport Hangars
New Construction, Infrastructure
Construction
$7,000,000 CJ est. value
Kalispell, MT 59901

Kalispell City Airport Hangars
New Construction, Infrastructure
Construction
$7,000,000 CJ est. value
Kalispell, MT 59901

Samaritan House Expansion
New Construction, Infrastructure, Build-out
Pending Verification
$6,000,000 CJ est. value
Kalispell, MT 59901

Samaritan House Expansion
New Construction, Infrastructure, Build-out
Pending Verification
$6,000,000 CJ est. value
Kalispell, MT 59901

North Bleacher Replacement - FA0238-03004 - Flathead County
Infrastructure
Conception
$568,950 CJ est. value
Kalispell, MT 59901

Last Updated 01/20/2023 11:43 AM
Project Title

Stormwater Treatment Facilities Project

Physical Address View project details and contacts
City, State (County) Kalispell, MT 59901   (Flathead County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sewage Treatment Plant, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $971,950 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project Category Code: Stormwater Improvements The project primarily consists of furnishing materials, labor, and equipment required to install new stormwater treatment facilities with approximately 3 hydrodynamic separators, 1 stormwater filter, 3 manholes, and 150 linear feet of 12-inch, 21-inch, and 42-inch storm sewer pipe. The project also includes pavement, asphalt concrete, sidewalk, curb and gutter, and landscape restoration. Contractor and any of the Contractor's Subcontractors bidding or doing work on this project are required to be registered with the Montana Department of Labor and Industry (DLI) at time of bid submission. Forms for registration are available from the Department of Labor and Industry, PO Box 8011, 1805 Prospect, Helena MT 59604-8011. Information on registration can be obtained by calling (406) 444-7734. The Contractor must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex or national origin. Any bidder wishing further information may obtain the same from the City of Kalispell Public Works Department, 201 First Avenue East, Kalispell, Montana 59901. Phone 406-758-7720. All bidders shall, as bid security, accompany the bid with: 1) lawful currency of the United States or a cashier's check; or 2) a certified check or bank money order drawn and issued by a national bank located in Montana or by a banking corporation incorporated in Montana; or 3) a bid bond or bonds, executed by a surety corporation authorized to do business in Montana. The bid security shall be in the amount of ten percent (10%) of the amount bid. Any such bank instrument shall be payable to the City of Kalispell. If a contract is awarded, the bidder whose bond is accepted and who shall thereafter refuse to enter into and execute the proposed contract, or as stated in the covenant, shall absolutely forfeit such moneys or bank instruments to the City, and become immediately liable on said bid bond in said sum. The bid security shall be returned to the unsuccessful bidders All bids must expressly covenant that if the bidder is awarded the contract, the bidder shall within fifteen (15) calendar days of the acceptance of said bid by the City Council, enter into a contract and give good and sufficient bond to secure the performance of the terms and conditions of the contract. In the event the successful bidder does not enter into a formal contract within fifteen (15) calendar days or give sufficient bond to secure performance, the bidder shall pay unto the City the difference between the amount of the bid of said bidder and the amount for which the City legally contracts with another party to perform said work if the latter amount is more than the former. Award of the project will be contingent upon funding and award concurrence from Council. Bids may only be withdrawn as provided in Section 15.03 of the Instructions to Bidders after the scheduled time for the public opening of bids. Except as provided in the aforementioned Section 15.03, no bid shall be withdrawn after the opening of bids without the consent of the City Council for a period of sixty (60) days after the scheduled time of receiving the bids. The City will accept the lowest responsible bid, but the Council reserves the right to reject any and all bids or to waive any technicality or informality and accept any bid which may be deemed in the best interest of the City. The successful bidder will be required to abide by Federal and State laws, particularly Section 18-2-401 et seq., M.C.A. (Montana Prevailing Wage Rates). The successful bidder will be required to furnish an acceptable security for the full amount of the contract for faithful performance thereof and payment of labor, material and subcontractor claims. The successful bidder will be assessed the Montana Contractor's withholding tax. The successful bidder shall be required to furnish to the City evidence of insurance in accordance with the Seventh Edition of the Montana Public Works Standard Specifications. The successful bidder shall for the purpose of the Contract with the City, name the City of Kalispell as additional insured on said policy while performing work under City contract. All additional questions must be submitted no later than 10:00 AM Tuesday, January 17, 2023. Pre bid Meeting - Microsoft Teams meeting Join on your computer, mobile app or room device Click here to join the meeting Meeting ID: 291 517 459 944 Passcode: pbkGuP Download Teams | Join on the web Or call in (audio only) +1 701-566-0964,,671741856# United States, Fargo Phone Conference ID: 671 741 856# Find a local number | Reset PIN Learn More | Meeting options

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents