Similar Projects
Civil and Paving Multiple Award Construction Contract
Term Contract
Bidding
Less than $95,000,000 est. value
Camp Lejeune, NC

Lake Joy Road Phase 5 Improvement
Post-Bid
Perry, GA 31069

Oakmulgee Ranger District Road Maintenance
Post-Bid
$2,500 to $5,000,000 est. value

Southern Region Disaster Recovery Support BPA
Results

Grade, Base, and Paving of Terrell Road
Results
Less than $789,048 est. value
Perry, GA 31069

Joint 2020 Local Maintenance And Improvement Grant
Post-Bid
Perry, GA

7.891 Miles of Milling, Inlay, Plant Mix Resurfacing and Single Surface Treatment Paving
Results
GA

Scott Road Extension Project
Post-Bid
GA 31025

1.443 Miles of Widening and Reconstruction for Additional Turn Lanes on SR 40 Beginning West of Grove Blvd (CS 481) and Extending East to Truss Plant Rd (PR 718)
Results

Mass Paving
Infrastructure
Post-Bid
GA

2.786 Miles of Milling and Plant Mix Resurfacing on SR 11 Conn Beginning at SR 7 And Extending East of SR 11
Results
GA

LMIG Street Resurfacing
Results
College Park, GA 30337

2021 SPLOST Milling and Resurfacing of Various Streets in Commission Districts 1 and 2
Results
Ellenwood, Forest Park, Lawrenceville, Macon, Morrow, Rex, Riverdale, Stockbridge, Union City, Warner Robins, Woodstock, GA 30294

Richland Creek Reservoir Entrance
Results
Less than $289,298 est. value
Cartersville, GA 30120

2021 LMIG Project
Results
Mount Vernon, GA

Reported 12/07/2021 12:00 AM
Project Title

Trellis Walk Full Depth Reclamation and Resurfacing

Physical Address View project details and contacts
City, State (County) Centerville, GA 31028   (Houston County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed construction consists of furnishing all materials and equipment and performing all labor necessary to complete the Full Depth Reclamation and Resurfacing of Trellis Walk in Centerville. All work will be in accordance with the Georgia Department of Transportation standard specifications and supplemental specifications (latest edition), the Georgia Manual for Erosion and Sediment Control (latest edition), Manual on Uniform Traffic Control Devices, and the City of Centerville. The proposed construction will be awarded in one contract.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents