Similar Projects
Last Updated | 04/06/2021 02:57 PM |
Project Title | WRF Chlorine Contact Chamber Modifications |
Physical Address | View project details and contacts |
City, State (County) | Ormond Beach, FL (Volusia County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $650,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work consists of installing baffle walls and making additional structural and mechanical modifications to the City’s existing chlorine contact tank at their water reclamation facility (WRF). A. Mobilization shall include the obtaining of all permits, insurance, and bonds; moving onto the site of all plant and equipment; furnishing and erecting plants, temporary buildings, and other construction facilities; all as required for the proper performance and completion of the Work. Mobilization shall include, but not be limited to, the following principal items. 1. Move onto the site all Contractors’ plant and equipment required for first month operations. 2. Install temporary construction power, wiring, and lighting facilities. 3. Establish fire protection plan and safety program. 4. Secure construction water supply. 5. Provide field office trailers for Contractor and as may be specified for Owner and Engineer. 6. Provide on-site sanitary facilities and potable water facilities as specified. 7. Arrange for and erect Contractor's work and storage yard and employee's parking facilities. 8. Submit all required insurance certificates and bonds. 9. Obtain all required permits. 10. Post all OSHA, EPA, Department of Labor, and all other required notices. 11. Have Contractor's superintendent at the job site full time. 12. Submit a detailed construction CPM schedule acceptable to the Engineer as specified. 13. Submit a schedule of values of the Work. 14. Submit a schedule of submittals. |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |