Similar Projects
2023 Fire Hydrant Painting
Term Contract
Sub-Bidding
Des Plaines, IL 60016

2023 Fire Hydrant Painting
Renovation
Sub-Bidding
$200,000 CJ est. value
Des Plaines, IL 60016

Painting Services to Paint Twenty-Three (23) Stations
Term Contract
Post-Bid
Chicago, IL

Court Repair, Color Coating, and Striping
Alteration
Post-Bid
Hoffman Estates, IL

Franklin Elementary School Lead Based Paint Mitigation
Renovation
Results
$42,330 CJ est. value
Chicago, IL 60610

Oriole Pool Painting Project
Renovation
Results
$220,000 CJ est. value
Morton Grove, IL 60053

GAP #0503 - Refresh
Renovation
Construction
Chicago, IL 60657

REHM Pool Painting
Infrastructure, Alteration
Post-Bid
Oak Park, IL 60304

John H Smyth Paint 1st , 2nd, 3rd Floor Hallways and Stairwells- Only Pre-Qualified Various Trades
Renovation
Results
$315,970 CJ est. value
Chicago, IL 60608

Meadowhill Aquatic Center Pool Slide Gelcoat and Painting
Alteration
Post-Bid
Northbrook, IL 60062

Pedestrian Bridge Painting
Infrastructure
Results
$433,833 CJ est. value
N Riverside, IL 60546

Pool Apparatus Painting, Shell Painting and Caulking
Alteration
Post-Bid
Northbrook, IL 60062

Portage Park Elementary School - Main Building Patch and Paint Various Trades
Renovation
Results
$629,767 CJ est. value
Chicago, IL 60641

Fire Hydrant Painting Program
Term Contract
Post-Bid
Orland Park, IL

3,000,000 Gallon Standpipe (Tank #3) Exterior Repaint with Containment And Miscellaneous Repairs
Renovation, Infrastructure
Results
$793,000 CJ est. value
Wheeling, IL 60090

Last Updated 05/16/2023 12:16 PM
Project Title

Gymnasium Ceiling and Duct Repainting at Hometown Elementary School

Physical Address View project details and contacts
City, State (County) Hometown, IL 60456   (Cook County)
Category(s) Single Trades
Sub-Category(s) Painting
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $50,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Architect has been authorized to refuse to issue plans and specifications and related bidding documents to any person, firm or corporation that the Architect considers to be unqualified. Proposals must be submitted on the forms provided. The proposal as a guarantee that if the proposal is accepted, a contract shall be entered into and the performance of the contract is properly secured. No bid shall be withdrawn after the opening of the proposals without the consent of School District 123 for a period of sixty (60) days after the scheduled time of closing bids. APPLICABLE REQUIREMENTS All employees of the Contractor or Subcontractor(s) on construction work for this Project shall be paid wages at rates not less than those prevailing on similar construction in the locality as determined by the Department of Labor in accordance with the applicable provisions of the "Wages of Employees on Public Works Act" (Prevailing Wage Act, Illinois Rev. Stat., 820 ILCS 130/1 et. seq.) and with all applicable provisions of the "Illinois' Preference Act", 30 ILCS 570/.01 et. seq. The Architect, which performance bonds shall be conditioned upon proper and faithful performance by the Contractor of the work specified in accordance with the plans and specifications therefore, according to the time and terms and conditions of the contract: and also that the successful Bidder, now the Contractor, shall properly pay all debts incurred by the Contractor in the execution of the work, including those for labor and material furnished for himself and all of his subcontractors. The bonding company shall have a minimum rating of "A- IX" in accordance with Best's Key Rating Guide - Latest Edition. The Contractor shall be required to furnish sufficient insurance to indemnify School District 123 against any and all claims which might arise for damages to persons or property due to the negligence of the Contractor or Subcontractors, or their officers, agents, employees or servants, during the construction of said improvement and until the said improvement has been finally accepted as complete by the School District 123. The Owner reserves the right to reject any and all proposals or bids. This project titled "Gym Ceiling and Duct Repainting" consist of the following major elements: 1. Covering existing surfaces and contents; 2. Removal of existing coatings; 3. Preparation of existing surfaces; 4. Application of new coating systems; 5. All other work indicated on the drawings and in the project manual for this project. Substantial Completion shall be on or before July 31, 2023

Details

Division 09 - Finishes, Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents