Similar Projects
Portable Waste Management Services
Term Contract
Design
Anniston, AL

Weatherization Service Areas
Alteration
Design
Aberfoil, AL 36089

Indian Pines Golf Course Irrigation System and Pump Station
Infrastructure
Bidding
$140,000 CJ est. value
Auburn, AL 36830

Provision of Ready Mixed Concrete for the Baldwin County Commission
Term Contract
Sub-Bidding
Bay Minette, AL 36507

Disaster Debris Removal and Disposal
Term Contract
Sub-Bidding
Opelika, AL 36801

Rsa Mobile Properties Fy 2021 Maintenance
Term Contract
Post-Bid
Mobile, AL 36602

MA-T700 Maintenance, Repair, and Operating Supplies
Term Contract
Post-Bid
Montgomery, AL

Door Access Key System
Alteration
Results
Opelika, AL

Provision of Hydraulic Mulches
Term Contract
Results
Bay Minette, AL 36507

Cutting Down of 3 Dead Trees
Term Contract
Design
Pisgah, AL 35765

Repair Voltage Regulators
Term Contract
Sub-Bidding
Opelika, AL 36801

Soft Wash Exterior Buildings
Term Contract
Post-Bid
Mobile, AL

Provision of Annual Traffic Signal Repair
Term Contract
Results
Bay Minette, AL 36507

Tuscaloosa's Lead Hazard Abatement Program
Term Contract
Design
Tuscaloosa, AL 35401

Transformer Repair
Term Contract
Sub-Bidding
Opelika, AL 36801

Last Updated 10/19/2022 10:33 AM
Project Title

Utility Easement Clearing - Phase I

Physical Address View project details and contacts
City, State (County) Northport, AL 35476   (Tuscaloosa County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes the clearing of approximately 8,750 +- linear feet, twenty (20) feet wide, isolated utility easements within the Northport City Limits for the specific project areas as shown on the location maps in the Appendix. The Owner reserves the right to waive any informality or to reject any or all bids, and to award the contract to the lowest and most responsible bidder. All bidders must comply with requirements of the Contractor's Licensing Law of the State of Alabama and be certified for the type of work on which the proposal is submitted. Each bidder must deposit with his bid, security in the amount, form, and subject to the conditions provided in the Information for Bidders. All Contractors preparing Bids for the referenced project shall submit a list of similar projects (successfully completed) in the last two years, having the same scope of work with construction cost similar to or greater than this project. All non-resident contractors preparing bids shall submit with the bid documents evidence of a current Alabama General Contractor's License, evidence (with original seal of the State of Alabama) of proper registration with the Alabama Secretary of State as a foreign corporation, and a Certificate of Good Standing as a Foreign Corporation from the State of Alabama Department of Revenue. Bids submitted by a non-resident contractor without these documents included will be rejected. No bidder may withdraw his bid within sixty (60) days after the opening thereof. Bids may be held by the Owner for a period not to exceed sixty (60) days from the date of opening of bids for the purpose of reviewing the bids and investigating the qualifications of the bidders prior to awarding the contract. This project is being funded by local funds. All bids must be submitted in the contract specifications book as issued by the Engineer. All bids must be submitted in a separate sealed envelope bearing on the outside the name of the Bidder, Bidder's license number, address, and name of the project: "Utility Easement Clearing - Phase I, City of Northport, Alabama". Envelopes containing bids must be addressed as follows and delivered to: City of Northport, 3500 McFarland Boulevard, Northport, Alabama 35476. The City of Northport is an equal opportunity employer.

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents