Similar Projects
Old Firehouse Renovation CM Services
Renovation
Bidding
Raymond, NH

Belmont Police Department
New Construction
Post-Bid
Belmont, NH 03220

Construction Manager Services - Fire Station 3 Addition and Renovations
Renovation, Addition - 9,600 SF
Results
Less than $1,300,000 est. value
Nashua, NH

Owner’s Project Management (OPM) Services for Fire Station Design and Construction
Results
North Conway, NH

Remodel Ashuelot Fire Station
Renovation
Results
Ashuelot, NH 03441

Design and Construction Services - Public Safety Facility
Results
Bristol, NH 03222

2020 Fire Department Bathroom Plumbing Renovations
Renovation
Results
Belmont, NH

Construction Management Services - Police Station
New Construction - 8,500 SF
Results
Belmont, NH

Amherst Police Department Remodel
Renovation - 11,040 SF
Results
Amherst, NH 03031

Renovation Police Department and Town Hall
Renovation - 900 SF
Results
Brentwood, NH 03833

Fire Station New Addition and Interior Work
Addition
Results
Newington, NH

Addition and Renovation of the Existing Fire Station
Renovation, Addition
Results
Surry, NH 03431

Fire Department Hall Project
Results
Epsom, NH 03234

Construction Management Services, New Construction Project, Tuftonboro Police Station
New Construction - 5,000 SF
Results
Less than $1,740,000 est. value
Tuftonboro, NH

Weirs Fire Department Bathroom and Kitchen Renovations Project
Renovation
Results
Laconia, NH 03246

Last Updated 06/02/2020 09:49 AM
Project Title

Design Build - Fire Station Addition

Physical Address View project details and contacts
City, State (County) Derry, NH   (Rockingham County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replace the existing modular structure located on the west side of Central Fire Station located at 131 East Broadway with a new stick built construction 12 foot wide x 46 foot long addition with one bedroom, one locker room, and one computer room. The Department of Public Works will demolish and remove the existing modular structure and excavate the site and prepare it for pouring of footing and frost walls by the contractor. Public works will also take care of backfilling around the foundation.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents