Similar Projects
Toquer Ridge
New Construction - 715,000 SF
Conception
$10,000,000 CJ est. value
Toquerville, UT 84774

Lakeview Business Park
New Construction
Design
$1,500,000,000 est. value
Tooele, UT 84074

Wasatch Peaks Ranch
New Construction
Design
Morgan, UT

Clearfield Station Tod Infrastructure Project
Infrastructure
Bidding
Clearfield, UT 84015

Redevelopment Site 738 - 756 30th Street
Infrastructure
Bidding
Ogden, UT 84403

Fold and Form Pipe Liner
Term Contract
Post-Bid
Taylorsville, UT 84129

Construction of the 400 East Storm Drain Rehab Phase 1
Post-Bid
Saint George, UT 84770

Groundwater Mitigation Project
Results
Less than $275,000 est. value
Vernal, UT 84078

Hiawatha Project Phase 2: Culvert Stabilization
Results
$140,000 to $150,000 est. value
Hiawatha, UT

Ridge At Alpine Phase 1
New Construction
Construction
Alpine, UT 84004

Bruno's Alpine Apartments
New Construction - 15,915 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Logan, UT 84321

Lakeshore Landing
New Construction
Pending Verification
American Fork, UT

Ephraim Crossing
New Construction
Pending Verification
Ephraim, UT

Ben Lomond Golf Course Mixed Use
New Construction - 40,836 SF
Design
Harrisville, UT 84414

JWP Museum River Restoration Project
Infrastructure
Bidding
Green River, UT

Last Updated 09/30/2021 09:51 AM
Project Title

Bookcliffs Pond Maintenance and Excavating

Physical Address View project details and contacts
City, State (County) State-Wide: UT
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Excavate and do Pond Maintenance for the wildlife in the Bookcliffs area.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents