Similar Projects
Tweedy Boulevard Traffic Signal Synchronization Project
Infrastructure
Sub-Bidding
$200,000 CJ est. value
South Gate, CA 90280

Cathodic Protection Improvement for Recycled Water Systems Project Phase 5 (REO-0204)
Infrastructure
Sub-Bidding
$374,285 CJ est. value
Long Beach, CA 90802

Conduit Infrastructure For Wi-Fi Expansion
Infrastructure
Post-Bid
Los Angeles, CA 90081

2001 North Garey Avenue Power Upgrade
Infrastructure
Post-Bid
Walnut, CA 91789

New 400-Amp Panel for Future Electric Vehicle Charging Stations, and Concrete Pad for Edison's Surface Mounted Transformer & Required Conduits
Alteration
Results
Torrance, CA 90504

Low Voltage and Network Cabling
Alteration
Results
Torrance, CA 90503

Taxiway Lights and Wire Replacement at Torrance Municipal Airport
Infrastructure
Sub-Bidding
$230,775 CJ est. value
Torrance, CA 90505

Building D 2nd Floor Labs Mechanical System Upgrades
Alteration
Post-Bid
$600,000 est. value
Long Beach, CA 90808

LAUS Wires And Cables
Alteration
Results
Less than $1,300,000 est. value
Los Angeles, CA 90081

Grand Avenue and Bennett Avenue Traffic Signal Modification - Left Turn Phasing
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Glendora, CA 91741

Electric Service Upgrade at Five School Sites
Renovation, Infrastructure
Post-Bid
Whittier, CA 90603

North Long Beach Collection Main Control Valve Upgrade
Infrastructure
Results
$1,116,000 est. value
Long Beach, CA 90899

Maintenance of Emergency Power Generators
Term Contract
Sub-Bidding
Los Angeles, CA 90744

Led Lighting Retrofit
Alteration
Post-Bid
Los Angeles, CA 90007

Electrical System Repair Services
Alteration
Results
CA

Last Updated 11/10/2022 02:20 PM
Project Title

Lakewood Boulevard Traffic Signal Improvements

Physical Address View project details and contacts
City, State (County) Bellflower, CA 90706   (Los Angeles County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $3,471,520 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Each bid must be accompanied by a certified or cashier's check or bidder's bond payable to the order of the City of Bellflower or cash for an amount not less than ten percent (10%) of the bid price submitted, and the check, bond, or cash deposit of the successful bidder shall be forfeited to the City if such bidder fails to enter into the contract to perform the work within ten (10) days after written notice of award. Bids will not be accepted after that time. At the time of contract award, the contractor shall possess a Class A or C-10 Contractor's License. No bid will be accepted from a contractor who has not been licensed in accordance with the Provisions of Chapter 9, Division III, of the Business and Professions Code of the State of California at the time the bid is submitted. Following the issuance of the Notice to Proceed, the contractor shall have one hundred twenty (120) working days to complete the work. Work on the Project must be performed in strict conformity with Specification No. 20/21- 01 as adopted by the City's City Council on August 8, 2022 which is filed with the City's Public Works Department. This project requires payment of State prevailing rates of wages for Los Angeles County. The contractor must post copies of the prevailing schedule at each job site. Copies of these rates of wages are available from the State of California Department of Industrial Relations Prevailing Wage Unit, Telephone No. (415) 703-4774. The website for this agency is currently located at website. Note that the Project is subject to compliance monitoring and enforcement by the California Department of Industrial Relations. Pursuant to California law, the City must find bids failing to comply with all applicable Labor Code requirements including, without limitation, Labor Code 1725.5 and 1771.4, to be nonresponsive. Five percent (5%) will be deducted from each progress payment and retained by the City. The remainder less the amount of all previous payments will be paid to the Contractor. Pursuant to Public Contracts Code ("PCC") 22300, the Contractor may substitute securities for retention monies held by the City or request that the City place such monies into an escrow account. The Contractor is notified, pursuant to PCC 22300, any such election will be at the Contractor own expense and will include costs incurred by the City to accommodate the Contractor's request. Part 1: LAKEWOOD BOULEVARD (4) INTERSECTIONS Part 2: LAKEWOOD BOULEVARD AND ALONDRA BOULEVARD

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents