Last Updated | 10/17/2022 11:01 PM |
Project Title | Morrill Bridge Replacement |
Physical Address | View project details and contacts |
City, State (County) | Gold Beach, OR 97444 (Curry County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Bridge, Maintenance, Paving/Reconstruction, Site Development, Water Lines |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Bidding, Construction start expected December 2022 |
Bids Due | View project details and contacts |
Estimated Value | $1,400,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Sealed bids for the construction of the Morrill Bridge Replacement for the Curry County Road Department (Owner) - Remove the existing Morrill bridge over Fork Floras Creek after completion of the new bridge. Bidders must prequalify five (5) days prior to the bid opening with the Owner. The project consists of: Construct new gravel roadway along a new alignment. Install required guardrails. Construct new 100-foot bridge. Provide grouted riprap and seeded bank stabilization. Install new storm water drains, gravel ditch and riprap basin. Install new asphalt concrete pavement on bridge deck and roadway. Remove existing bridge and pilings. Provide traffic control required for construction. Provide required erosion control measures. Comply with all regulatory permits. Bids not fully completed in accordance with the Instructions to Bidders will not be considered. A Bid Security executed in favor of the Owner in the amount of not less than 10% of the total amount of the Bid is required. Per ORS 279C.385 (2), Bid Security is to be forfeited as fixed and liquidated damages should the Bidder neglect or refuse to enter into a Contract and provide suitable insurance certificates, bonds, and other required documents for the faithful performance of the work in the event the Bidder is awarded the Contract. All bidders must be equal opportunity employers, provide proof of an employee drug testing program, be registered with the Construction Contractors Board and comply with all state and federal laws. Each Bidder must submit a First-Tier Subcontractor Disclosure Form, Evidence of Authority to Sign Bid, and Evidence to do Business in the State within two working hours of the time for receipt of the Bid. Contractors and all subcontractors shall pay at least the state prevailing rate of wage as determined under ORS 279C.815. ORS 279C.800 to 279C.870 will be administered and enforced in accordance with state law and regulations. Work under this Contract will be funded in part with funds from the State Funded Local Project Program Loan No. 33365. No Bid will be received or considered by the Owner unless the Bid contains: 1) a statement that Bidder will comply with the provisions of 40 USC 276a and ORS 279C.840 and 2) a statement as to whether the Bidder is a resident Bidder as defined in ORS 279A.120. The Owner reserves the right to reject any or all Bids, to waive all informalities, and to accept such Bids that in the opinion of the Owner are in the best interest of the Owner. |
||||||||||||||||||||||
Details |
|
||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |