Similar Projects
Sports Complex
New Construction, Infrastructure
Bidding
$700,000 CJ est. value
Booneville, MS 38829

Northeast Mississippi Community College - Sidewalks and Lighting Phase 3
Infrastructure
Bidding
$120,000 CJ est. value
Booneville, MS 38829

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Booneville/Baldwyn Airport Runway and Taxiway Overlay
Infrastructure
Post-Bid
$2,261,723 CJ est. value
Baldwyn, MS 38824

West Industrial Park Access and and Site Improvements Phase 2
Infrastructure
Results
MS

Grade, Drain, Base and DBST Pave
Infrastructure
Results
$953,202 CJ est. value
Booneville, MS 38829

Emergency Road and Bridge Repair Fund Project on County Road 8301
Infrastructure
Post-Bid
$200,000 CJ est. value
Booneville, MS 38829

The Construction of 1.336 Miles of Grade, Drain, Base and Surface
Infrastructure
Results
$953,202 CJ est. value
Booneville, MS 38829

Dollar General #25307 / Booneville
New Construction, Infrastructure - 10,733 SF
Post-Bid
$2,000,000 CJ est. value
Booneville, MS 38829

Sidewalk Improvements
Infrastructure
Post-Bid
$300,000 CJ est. value
Booneville, MS 38829

Jumpertown Sidewalk Improvements
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Jumpertown, MS 38829

Wastewater System Improvements-2021
Infrastructure
Post-Bid
$251,714 CJ est. value
Booneville, MS 38829

Jumpertown Wastewater System Improvements
Infrastructure
Post-Bid
$309,114 CJ est. value
Booneville, MS 38829

Last Updated 04/26/2023 11:48 AM
Project Title

Phase One Water System Improvements

Physical Address View project details and contacts
City, State (County) Booneville, MS 38829   (Prentiss County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Bids by Invitation
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $750,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the installation of approximately 15,000 feet of 6 inch waterline. Construction start anticipated May 2023.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents