Similar Projects
Western Multiple Award Task Order Contract (MATOC) for Horizontal Construction
Design
$2,000 to $4,000,000,000 est. value
Tucson, Yuma, AZ - El Centro, San Diego, CA

High Water Crossing at Vamori Wash
Post-Bid
$10,000,000 to $20,000,000 est. value
Tucson, AZ 85746

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

Construction Manager at Risk Services: South Houghton Road Widening
Results
Tucson, AZ 85701

Pavement Rehabilitation
Results
Less than $40,000,000 est. value
Tucson, AZ 85701

Costco #407 Entry Drive Widening
Renovation
Construction
Tucson, AZ 85712

Groundhog Vista Landowners Roadwork
Post-Bid
Tucson, AZ 85743

Pavement Rehabilitation
Results
Less than $40,000,000 est. value
Tucson, AZ 85701

Gladden Farms Birchfield Drive and Mikeetter Boulevard (East)
Infrastructure
Post-Bid
Marana, AZ

FY21 Local Roadways Pavement Repair
Results
$6,408,115 est. value
Tucson, AZ 85701

Asphalt Repair and Re-Pavement Materials and Services
Term Contract
Post-Bid
Buckeye, Douglas, Florence, Globe, Goodyear, Phoenix, Safford, Saint Johns, Somerton, Tucson, Winslow, AZ 85607

FY21 Local Roadways Pavement Repair Districts 1 and 4
Results
$4,825,000 est. value
Tucson, AZ 85701

Mission Manor Parking Lot Repair and Addition
Infrastructure
Post-Bid
Tucson, AZ 85706

AZ FTNP CAGR 10(2) Entrance Road
Results
AZ

Job Order Master Agreement Transportation Improvement And Maintenance
Term Contract, Infrastructure
Post-Bid
$2,000,000 to $10,000,000 est. value
AZ

Reported 04/01/2022 12:00 AM
Project Title

Pines Settlement Repair

Physical Address View project details and contacts
City, State (County) Marana, AZ 85743   (Pima County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work for consist of perform deep polyurethane structural foam injection, the removal and replacement of surface paving and concrete improvements. Curb, sidewalk and pavement will be replaced and ABC re-graded to remove the existing 2-1/2” crowned warped section to straight grade to drain to the existing trench drain at the intersection of Douglas Fir Dr. and N Stone Mountain Pine Way. Area for volume determination of measurement will be taken along the perimeter tubes, and depth based on the planned 20’ depth, or refusal depth and average end area of the proximal tube grid. All tubes must be cut flush, or countersunk, and permanently patched.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents