Similar Projects
Reported | 04/01/2022 12:00 AM |
Project Title | Pines Settlement Repair |
Physical Address | View project details and contacts |
City, State (County) | Marana, AZ 85743 (Pima County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction, Sidewalks/Parking Lot |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Scope of work for consist of perform deep polyurethane structural foam injection, the removal and replacement of surface paving and concrete improvements. Curb, sidewalk and pavement will be replaced and ABC re-graded to remove the existing 2-1/2” crowned warped section to straight grade to drain to the existing trench drain at the intersection of Douglas Fir Dr. and N Stone Mountain Pine Way. Area for volume determination of measurement will be taken along the perimeter tubes, and depth based on the planned 20’ depth, or refusal depth and average end area of the proximal tube grid. All tubes must be cut flush, or countersunk, and permanently patched. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |