Similar Projects
Roundabout and Trail Construction - TH 21
Infrastructure
Conception
$2,000,000 CJ est. value
Jordan, MN 55352

Roundabout and Trail Construction - TH 21
Infrastructure
Conception
$2,000,000 CJ est. value
Jordan, MN 55352

Canterbury Independent Living
New Construction
Design
Shakopee, MN 55379

Minnesota Mash Baseball Facility
New Construction, Infrastructure - 67,768 SF
Design
$15,700,000 CJ est. value
Savage, MN 55378

Idaho Court Trail River Crossing
New Construction, Infrastructure
Bidding
$500,000 CJ est. value
Savage, MN 55378

Idaho Court Trail River Crossing
New Construction, Infrastructure
Bidding
$500,000 CJ est. value
Savage, MN 55378

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

2021 Alley Reconstruction
Results
$153,000 est. value
Shakopee, MN

170th Street Improvement Project
Infrastructure
Results
Prior Lake, MN

Springview Meadow Residential Development
New Construction, Infrastructure
Construction
Prior Lake, MN

Chase Bank / Savage
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Savage, MN 55378

Chase Bank / Savage
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Savage, MN 55378

Marion Village
New Construction, Infrastructure
Conception
$13,500,000 CJ est. value
Savage, MN 55378

Canterbury Park Amphitheater
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Shakopee, MN 55379

Last Updated 11/21/2022 03:11 PM
Project Title

2022 Pavement Rehabilitation Prior Lake-Savage Area Schools

Physical Address View project details and contacts
City, State (County) Prior Lake, MN 55372   (Scott County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $780,217 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of November 21, 2022, the project has not been awarded. A timeline for award has not been confirmed. Prior Lake High School, Grainwood Elem, Jeffers Pond Elem, Redtail Ridge Elem, Edgewood/WestWood Elem, Bridges Area Learning Center. Repair damaged pavement, catch basins, and concrete curbing. Mill and overlay lots and drives. Crack seal and seal coat. Restripe. Work occurs at six school district sites. Contact QuestCDN at 952-233-1632 or info@questcdn.com for assistance in free membership registration, downloading, and working with this digital project information. Plan Holders are parties that have downloaded the plans and specifications. Plan holders will be notified via email as addenda are issued. List of plan holders and bid results may be viewed at questcdn or website

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents