Similar Projects
I-44 - Utilities
Infrastructure
Conception
$885,851 CJ est. value
Norman, OK 73026

Grade, Drain, Bridge and Surface - SH 37
Infrastructure
Conception
$20,000,000 CJ est. value
Oklahoma City, OK 73170

Utilities - US 60
Infrastructure
Design
$992,109 CJ est. value
Bluejacket, OK 74333

Utilities - US 77
Infrastructure
Design
$1,250,000 CJ est. value
Noble, OK 73068

District 2 Luther Road Bridge Repair (N Canadian River & Railroad Bridge)
Infrastructure
Bidding
$3,000,000 CJ est. value
Oklahoma City, OK 74857

Pedestrian Improvements (Sidewalks) - SH-152
Infrastructure
Bidding
$374,635 CJ est. value
Binger, OK 73009

Oklahoma Forensics Center - Bid Package #1
Addition, Build-out, Renovation, Infrastructure - 34,989 SF
Sub-Bidding
$15,500,000 CJ est. value
Vinita, OK 74301

City of Norman - Emergency Communications & Operations Center: BP #2
New Construction, Infrastructure
Sub-Bidding
$500,000 CJ est. value
Norman, OK 73071

Piedmont Middle School
New Construction
Post-Bid
$16,000,000 est. value
Piedmont, OK 73078

Elementary Remodel Project
Renovation
Post-Bid
Geronimo, OK

CB Cameron Park
New Construction
Results
$3,543,000 est. value
Oklahoma City, OK 73170

Calumet Ag Barn and Locker Room Addition
Addition
Results
Calumet, OK

New Hospital - Cherokee Nation
New Construction, Infrastructure
Construction
$400,000,000 CJ est. value
Tahlequah, OK 74464

Basin N04 Sanitary Sewer Rehabilitation
Infrastructure
Construction
$1,828,039 CJ est. value
Sapulpa, OK 74066

2019 Bond - Edison Elementary Renovations - Bristow Public Schools
Renovation, Infrastructure
Pending Verification
$546,293 CJ est. value
Bristow, OK 74010

Last Updated 04/10/2023 09:06 AM
Project Title

2023 Bond - Waynoka Public Schools

Physical Address View project details and contacts
City, State (County) Waynoka, OK 73860   (Woods County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Middle/Senior High School, Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected February 2024
Bids Due View project details and contacts
Estimated Value $7,865,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 21, 2023, the bond vote passed. Design team(s) and have not been identified and a bidding/construction timeline has not been established. Date of new bond election : February 14, 2023 Amount of new bond election : $ 7,865,000 Projects to be completed with new bond election proceeds : Construct,equip and furnish a classroom addition to include but not limited to stem and science classrooms ; construct, equip and furnish an indoor practice facility to include but not be limited to restrooms and concessions and install a new six land track. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Selective Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents