Last Updated | 11/18/2022 11:02 AM |
Project Title | WRP Sluice Gate Replacement Project #2 |
Physical Address | View project details and contacts |
City, State (County) | San Clemente, CA 92672 (Orange County) |
Category(s) | Single Trades |
Sub-Category(s) | Windows/Doors |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $193,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The WORK of this Contract will consist of upgrading mechanical and electrical components of the Chlorine Contact Basin and Reclamation Storage Bay within the City of San Clementes Water Reclamation Plant. The WORK shall include but not limited to the following majorwork items: Removal and replacement of 1 sluice gates within the Reclamation Storage Bay Splitter Box. Removal and replacement of 1 sluice gate within the Chlorine Contact Basin Inlet Structure. Field verification of existing conditions prior to sluice gate fabrication. Installation of 1 new open/close electric actuators within the Reclamation Storage Bay Splitter Box. Associated electrical improvements for the new electrical actuators (all power and control requirements). Contractor shall furnish, supply, and install all control hardware (RIO PLC Panel). Contractor shall terminate all wires to the supplied RIO Panel. Integration of the proposed improvements (i.e. gate control logic) within the existing filter PLC and SCADA system will be provided by the City. Removal of existing, and installation of new aluminum grating in areas identified in the plans (bid option). Response Format Electronic Project Type Bid Response Types Line Items Specifications (required) Type of Award Lump Sum License Requirements Class A Liquidated Damages $1000 Project Duration 150 Working days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Electronic Q&A No The WORK of this Contract will consist of upgrading mechanical and electrical components of the Chlorine Contact Basin and Reclamation Storage Bay within the City of San Clemente's Water Reclamation Plant. The project value listed reflects the total project estimate. 4. Questions. All questions related to this bid solicitation must be submitted in writing via email to Amir K. Ilkhanipour at ilkhanipoura@san-clemente.org no later than Thursday, October 6th, 2022, at 2:00 p.m |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |