Similar Projects
High Friction Surface Treatment and Pavement Markings
Infrastructure
Bidding
$448,000 est. value
Traverse City, MI

Galvanized Water Services Replacement Project
Infrastructure
Bidding
$350,000 est. value
Traverse City, MI

Paving & Site Lighting
Post-Bid

District Parking Lots Repair / Sealcoat
Post-Bid
Kingsley, MI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

West Boardman Lake Trail Loop: Medalie Park to Northwestern Michigan College & Lake Ridge Drive Sidewalk
Results
Traverse City, MI

2022 HMA Program
Infrastructure
Bidding
$800,000 est. value
Traverse City, MI

Removal of Thin Epoxy Overlay
Infrastructure
Post-Bid

East Front Street Streetscape Design Plan
Results
Traverse City, MI

2022 Paving and Resurfacing Project
Infrastructure
Bidding
$2,000,000 est. value
Traverse City, MI

Art on the Tart - 10th Street Trailhead
Infrastructure
Post-Bid
Traverse City, MI

Calumet-Swedetown Trail Capping, And Route Grading
Results

Pre Qualified Maintenance - Cold Water Welcome Center-HMA-I-69
Infrastructure
Post-Bid

Serving Line Replacement
Results
Kingsley, MI

Keystone/River Road Roundabout Construction
Alteration
Post-Bid
Traverse City, MI

Last Updated 07/25/2022 12:03 PM
Project Title

Eighth Street- Lake Avenue to Woodmere - 882-18-CIP - City Of Traverse City

Physical Address View project details and contacts
City, State (County) Traverse City, MI 49684   (Grand Traverse County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $10,550,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call to design to be based on outcomes of 8th Street Charrette. This project will reconstruct 8th Street from Lake Avenue to Woodmere Avenue including sidewalks , curb and gutter, storm sewers, sanitary sewers, watermain and street reconstruction. As of October 12, 2021, this project is included in the Traverse City 2018-2024 Capital Improvement Program (CIP). Information regarding an architect, general contractor or method of selection has not been disclosed. A firm construction timeline has not been determined. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available *The contact(s) will not accept phone call inquiries at this time.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents